Building Construction The opening provided in sloping roof with its top parallel to the roof surface, is called Louvered window Lantern window Dormer window Sky light window Louvered window Lantern window Dormer window Sky light window ANSWER DOWNLOAD EXAMIANS APP
Building Construction The member which is placed horizontally to support common rafter of a sloping roof, is Purlin Cleat Strut Batten Purlin Cleat Strut Batten ANSWER DOWNLOAD EXAMIANS APP
Building Construction The width of the hollow space between two walls of a cavity wall should not exceed 5 cm 7.5 cm 10 cm 15 cm 5 cm 7.5 cm 10 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum number of steps in a flight should generally be restricted to 15 12 No limit 10 15 12 No limit 10 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil can be improved by Compacting the soil Increasing the depth of foundation Grouting Draining the soil Compacting the soil Increasing the depth of foundation Grouting Draining the soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile provided with one or more bulles in its vertical shaft, is generally known as Sheet pile Bearing pile Friction pile Under-ream pile Sheet pile Bearing pile Friction pile Under-ream pile ANSWER DOWNLOAD EXAMIANS APP