Building Construction The additional piles which are driven to increase the capacity of supporting loads on vertical piles, are known Raking piles Construction piles Sinking piles Eccentric piles Raking piles Construction piles Sinking piles Eccentric piles ANSWER DOWNLOAD EXAMIANS APP
Building Construction A pre-stressed concrete pile is Easy to handle Lighter in weight All of these Extremely durable Easy to handle Lighter in weight All of these Extremely durable ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of bond in a brick masonry containing alternate courses of stretchers and headers, is called Stretcher bond English bond Header bond Flemish bond Stretcher bond English bond Header bond Flemish bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 7 days 3 days 14 days 21 days 7 days 3 days 14 days 21 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Mansard roof is a roof which slopes in Four directions without break in the slope on each side Two directions without break in the slope on each side Four directions with break in the slope on each side Two directions with break in the slope on each side Four directions without break in the slope on each side Two directions without break in the slope on each side Four directions with break in the slope on each side Two directions with break in the slope on each side ANSWER DOWNLOAD EXAMIANS APP
Building Construction Assertion A : Shishum is used for decorative woodwork.Reason R : Shishum can be polished to an excellent finish.Select your answer according to the coding system given below: Both A and R is true but R is not the correct explanation of A A is false but R is true A is true but R is false Both A and R is true and R is the correct explanation of A Both A and R is true but R is not the correct explanation of A A is false but R is true A is true but R is false Both A and R is true and R is the correct explanation of A ANSWER DOWNLOAD EXAMIANS APP