Building Construction Sum of tread and rise must lie between 500 to 550 mm 400 to 450 mm 600 to 650 mm 300 to 350 mm 500 to 550 mm 400 to 450 mm 600 to 650 mm 300 to 350 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For brick construction, the lime-sand mortar, is 1 : 1 1 : 2 1 : 3 1 : 4 1 : 1 1 : 2 1 : 3 1 : 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 15 to 20 cm 25 to 30 cm 30 to 45 cm 5 to 10 cm 15 to 20 cm 25 to 30 cm 30 to 45 cm 5 to 10 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The under surface of an arch, is called Soffit Haunch Intrados Back Soffit Haunch Intrados Back ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Rise Intrados Extrados Spandril Rise Intrados Extrados Spandril ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A flap valve at the bottom of tube is provided to extract the soil sample A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A flap valve at the bottom of tube is provided to extract the soil sample A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here ANSWER DOWNLOAD EXAMIANS APP