Building Construction

Building Construction
Sum of tread and rise must lie between

400 to 450 mm
600 to 650 mm
500 to 550 mm
300 to 350 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The pile which is provided with a bulb filled with concrete at its lower end, is known as

Simplex pile
Franki pile
Raymond pile
Mac-Arthur pile

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The process of keeping concrete moist for a certain period after its finishing, is known as

Compaction of concrete
Curing of concrete
Placing of concrete
Finishing of concrete

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The piece of a brick cut along the centre of width in such a way that its length is equal to that of full brick, is called

Half brick
King closer
Bevelled closer
Queen closer

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The lower half portion between crown and skew back of the arch, is called

Haunch
Spandril
Springing
Soffit

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The range of spread from the wall base to outer edge of a brick work foundation does not exceed

1 horizontal to 1 vertical
2 horizontals to 1 vertical
2/3 horizontal to 1 vertical
1/2 horizontal to 1 vertical

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑