Building Construction Sum of tread and rise must lie between 600 to 650 mm 500 to 550 mm 400 to 450 mm 300 to 350 mm 600 to 650 mm 500 to 550 mm 400 to 450 mm 300 to 350 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than h/4 2 h h 1/2h h/4 2 h h 1/2h ANSWER DOWNLOAD EXAMIANS APP
Building Construction Cavity wall is generally provided for Prevention of dampness All of these Heat insulation Sound insulation Prevention of dampness All of these Heat insulation Sound insulation ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of bond in which every course contains both headers and stretchers, is called Mixed bond Russian bond Flemish bond English bond Mixed bond Russian bond Flemish bond English bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of the ground water table may be ascertained by None of these Standing on the well in the vicinity Measuring the depth of water in the well Looking through the well in the vicinity None of these Standing on the well in the vicinity Measuring the depth of water in the well Looking through the well in the vicinity ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/10th of the span 1/8th of the span 1/6th of the span 1/12th of the span 1/10th of the span 1/8th of the span 1/6th of the span 1/12th of the span ANSWER DOWNLOAD EXAMIANS APP