Building Construction Sum of tread and rise must lie between 500 to 550 mm 400 to 450 mm 300 to 350 mm 600 to 650 mm 500 to 550 mm 400 to 450 mm 300 to 350 mm 600 to 650 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil can be improved by Draining the soil Grouting Compacting the soil Increasing the depth of foundation Draining the soil Grouting Compacting the soil Increasing the depth of foundation ANSWER DOWNLOAD EXAMIANS APP
Building Construction For effective drainage, the finished surface of flat roof should have a minimum slope of 1 to 50 1 in 10 1 in 5 1 in 20 1 to 50 1 in 10 1 in 5 1 in 20 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Number of vertical joints in a stretcher course is x times the number of joints in the header course, where x is equal to 2 1/2 1 1/4 2 1/2 1 1/4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In soft clay of low bearing capacity, the type of steel pile generally used, is Pipe pile Screw pile Disc pile H-pile Pipe pile Screw pile Disc pile H-pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The number of steps in a flight generally should not be less than 5 No limit 2 3 5 No limit 2 3 ANSWER DOWNLOAD EXAMIANS APP