Building Construction Sum of tread and rise must lie between 400 to 450 mm 600 to 650 mm 500 to 550 mm 300 to 350 mm 400 to 450 mm 600 to 650 mm 500 to 550 mm 300 to 350 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Peeling Blistering Hacking Dubbing Peeling Blistering Hacking Dubbing ANSWER DOWNLOAD EXAMIANS APP
Building Construction An ordinary concrete may be made water proof by adding Snowcem Impermo All of these Pudlo Snowcem Impermo All of these Pudlo ANSWER DOWNLOAD EXAMIANS APP
Building Construction To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act Neither (A), (B) nor (C) At the centre of the base Within the middle third of the base Within the middle fifth of the base Neither (A), (B) nor (C) At the centre of the base Within the middle third of the base Within the middle fifth of the base ANSWER DOWNLOAD EXAMIANS APP
Building Construction The highest line of sloping roof, where two opposite slopes meet, is known as Rafter Crown Eave Ridge Rafter Crown Eave Ridge ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil can be improved by Grouting Draining the soil Compacting the soil Increasing the depth of foundation Grouting Draining the soil Compacting the soil Increasing the depth of foundation ANSWER DOWNLOAD EXAMIANS APP