Building Construction

Building Construction
Sum of tread and rise must lie between

300 to 350 mm
500 to 550 mm
400 to 450 mm
600 to 650 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form work from the sides of beams can be removed only after

4 days
1 day
14 days
7 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Weep holes are provided in retaining and breast walls

To add architectural beauty
To ventilate the stone masonry
To drain off the water from the filling
To increase compaction of the earth retained

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than

h
1/2h
h/4
2 h

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The highest line of sloping roof, where two opposite slopes meet, is known as

Rafter
Crown
Ridge
Eave

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The vertical side member of a shutter frame, is known

Reveal
Style
Mullion
Post

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑