Building Construction Sum of tread and rise must lie between 600 to 650 mm 300 to 350 mm 400 to 450 mm 500 to 550 mm 600 to 650 mm 300 to 350 mm 400 to 450 mm 500 to 550 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The local swelling of a finished plaster, is termed Cracking Dubbing Hacking Blistering Cracking Dubbing Hacking Blistering ANSWER DOWNLOAD EXAMIANS APP
Building Construction Under reamed piles are generally used for Factory building Tall structures Machine foundations All listed here Factory building Tall structures Machine foundations All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The black cotton soil Shrinks excessively when dry All of these Undergoes volumetric changes Swells excessively when wet Shrinks excessively when dry All of these Undergoes volumetric changes Swells excessively when wet ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept Less than its projection beyond wall base Equal to its projection beyond wall base 10 cm 15 cm Less than its projection beyond wall base Equal to its projection beyond wall base 10 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of arch used for high class buildings where appearance is of prime importance, is known as Ashlar arch Gauged brick arch Axed brick arch Rubble arch Ashlar arch Gauged brick arch Axed brick arch Rubble arch ANSWER DOWNLOAD EXAMIANS APP