Building Construction Sum of tread and rise must lie between 400 to 450 mm 600 to 650 mm 500 to 550 mm 300 to 350 mm 400 to 450 mm 600 to 650 mm 500 to 550 mm 300 to 350 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile which is provided with a bulb filled with concrete at its lower end, is known as Simplex pile Franki pile Raymond pile Mac-Arthur pile Simplex pile Franki pile Raymond pile Mac-Arthur pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of keeping concrete moist for a certain period after its finishing, is known as Compaction of concrete Curing of concrete Placing of concrete Finishing of concrete Compaction of concrete Curing of concrete Placing of concrete Finishing of concrete ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut along the centre of width in such a way that its length is equal to that of full brick, is called Half brick King closer Bevelled closer Queen closer Half brick King closer Bevelled closer Queen closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lower half portion between crown and skew back of the arch, is called Haunch Spandril Springing Soffit Haunch Spandril Springing Soffit ANSWER DOWNLOAD EXAMIANS APP
Building Construction The range of spread from the wall base to outer edge of a brick work foundation does not exceed 1 horizontal to 1 vertical 2 horizontals to 1 vertical 2/3 horizontal to 1 vertical 1/2 horizontal to 1 vertical 1 horizontal to 1 vertical 2 horizontals to 1 vertical 2/3 horizontal to 1 vertical 1/2 horizontal to 1 vertical ANSWER DOWNLOAD EXAMIANS APP