Building Construction Sum of tread and rise must lie between 300 to 350 mm 500 to 550 mm 400 to 450 mm 600 to 650 mm 300 to 350 mm 500 to 550 mm 400 to 450 mm 600 to 650 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 4 days 1 day 14 days 7 days 4 days 1 day 14 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Weep holes are provided in retaining and breast walls To add architectural beauty To ventilate the stone masonry To drain off the water from the filling To increase compaction of the earth retained To add architectural beauty To ventilate the stone masonry To drain off the water from the filling To increase compaction of the earth retained ANSWER DOWNLOAD EXAMIANS APP
Building Construction For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than h 1/2h h/4 2 h h 1/2h h/4 2 h ANSWER DOWNLOAD EXAMIANS APP
Building Construction The highest line of sloping roof, where two opposite slopes meet, is known as Rafter Crown Ridge Eave Rafter Crown Ridge Eave ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical side member of a shutter frame, is known Reveal Style Mullion Post Reveal Style Mullion Post ANSWER DOWNLOAD EXAMIANS APP