Building Construction Sum of tread and rise must lie between 300 to 350 mm 500 to 550 mm 400 to 450 mm 600 to 650 mm 300 to 350 mm 500 to 550 mm 400 to 450 mm 600 to 650 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For plastering the exposed brick walls, the cement sand mortar should be 1 : 4 1 : 6 1 : 3 1 : 2 1 : 4 1 : 6 1 : 3 1 : 2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum bearing capacity of soil is that of Hard rocks Dry coarse sandy soil Loose fine sandy soil Black cotton soil Hard rocks Dry coarse sandy soil Loose fine sandy soil Black cotton soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lower edge of the pitched roof, from where the rain water of the roof surface drops down, is known as Hip Gable Ridge Eaves Hip Gable Ridge Eaves ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wall constructed to resist the pressure of an earth filling, is called Parapet wall Retaining wall Buttress Breast wall Parapet wall Retaining wall Buttress Breast wall ANSWER DOWNLOAD EXAMIANS APP