Building Construction Pile foundation is generally provided if soil is Compressible Made up All listed here Water logged Compressible Made up All listed here Water logged ANSWER DOWNLOAD EXAMIANS APP
Building Construction Number of vertical joints in a stretcher course is x times the number of joints in the header course, where x is equal to 1 1/4 1/2 2 1 1/4 1/2 2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical side member of a shutter frame, is known Style Reveal Mullion Post Style Reveal Mullion Post ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of concrete bed of the foundation depends upon The projection of the concrete block beyond the footing over it All listed here The upward soil pressure The mix of the concrete The projection of the concrete block beyond the footing over it All listed here The upward soil pressure The mix of the concrete ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for beams and slabs; is 30 to 125 mm 25 to 50 mm 25 to 75 mm 50 to 100 mm 30 to 125 mm 25 to 50 mm 25 to 75 mm 50 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Crown is located at Skew-back of the arch Highest point on the extrados of the arch None of these Highest point on the intrados of the arch Skew-back of the arch Highest point on the extrados of the arch None of these Highest point on the intrados of the arch ANSWER DOWNLOAD EXAMIANS APP