Building Construction Pile foundation is generally provided if soil is Made up Compressible All listed here Water logged Made up Compressible All listed here Water logged ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 5, 4, 3, 2, 1 3, 2, 5, 1, 4 1, 2, 3, 4, 5 2, 1, 3, 5, 4 5, 4, 3, 2, 1 3, 2, 5, 1, 4 1, 2, 3, 4, 5 2, 1, 3, 5, 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum strength of the mortar used in load bearing brick masonry, is 50 N/cm2 200 N/cm2 100 N/cm2 150 N/cm2 50 N/cm2 200 N/cm2 100 N/cm2 150 N/cm2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In horizontal D.P.C, thickness of cement concrete (1 : 2 : 4) is 4 cm 2 cm 6 cm 8 cm 4 cm 2 cm 6 cm 8 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Single Flemish bond consists of Stretcher bond facing and double Flemish bond backing in each course English bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course Double Flemish bond facing and English bond backing in each course Stretcher bond facing and double Flemish bond backing in each course English bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course Double Flemish bond facing and English bond backing in each course ANSWER DOWNLOAD EXAMIANS APP
Building Construction For plastering the exposed brick walls, the cement sand mortar should be 1 : 2 1 : 3 1 : 4 1 : 6 1 : 2 1 : 3 1 : 4 1 : 6 ANSWER DOWNLOAD EXAMIANS APP