Building Construction The stepped structure provided for lateral support of a structure, is Parapet wall Buttress Breast wall Retaining wall Parapet wall Buttress Breast wall Retaining wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then d = 0.775 a None of these d = 0.445 a d = 0.557 a d = 0.775 a None of these d = 0.445 a d = 0.557 a ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wall constructed to resist the pressure of an earth filling, is called Retaining wall Buttress Breast wall Parapet wall Retaining wall Buttress Breast wall Parapet wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction The highest line of sloping roof, where two opposite slopes meet, is known as Ridge Rafter Crown Eave Ridge Rafter Crown Eave ANSWER DOWNLOAD EXAMIANS APP
Building Construction The X-ray rooms are plastered with Barium plaster Keen's cement Plaster of Paris Martin's cement Barium plaster Keen's cement Plaster of Paris Martin's cement ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 mm 65 to 100 mm 25 to 40 mm 40 to 65 mm 25 mm 65 to 100 mm 25 to 40 mm 40 to 65 mm ANSWER DOWNLOAD EXAMIANS APP