Building Construction The stepped structure provided for lateral support of a structure, is Parapet wall Breast wall Retaining wall Buttress Parapet wall Breast wall Retaining wall Buttress ANSWER DOWNLOAD EXAMIANS APP
Building Construction A solid core of rock is formed inside the cylinder in the case of Wash boring Auger boring Diamond drilling Percussion drilling Wash boring Auger boring Diamond drilling Percussion drilling ANSWER DOWNLOAD EXAMIANS APP
Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 90° 60° 0° 30° 90° 60° 0° 30° ANSWER DOWNLOAD EXAMIANS APP
Building Construction While investigating the site, a thick layer of fairly firm clay over a deep layer of soft clay is encountered. In such a situation, the following type of foundation is useful: None of these Raft foundation Pile formation Grillage foundation None of these Raft foundation Pile formation Grillage foundation ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 4 days 1 day 14 days 7 days 4 days 1 day 14 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile which supports the load partly by friction and partly by resting on hard stratum, is called Friction pile Friction bearing pile Bearing pile Rough pile Friction pile Friction bearing pile Bearing pile Rough pile ANSWER DOWNLOAD EXAMIANS APP