Building Construction

Building Construction
The stepped structure provided for lateral support of a structure, is

Parapet wall
Breast wall
Retaining wall
Buttress

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
A solid core of rock is formed inside the cylinder in the case of

Wash boring
Auger boring
Diamond drilling
Percussion drilling

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The angle between skew back of a flat arch and the horizontal, is kept approximately equal to

90°
60°
0°
30°

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
While investigating the site, a thick layer of fairly firm clay over a deep layer of soft clay is encountered. In such a situation, the following type of foundation is useful:

None of these
Raft foundation
Pile formation
Grillage foundation

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form work from the underside of slabs, can be removed only after

4 days
1 day
14 days
7 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The pile which supports the load partly by friction and partly by resting on hard stratum, is called

Friction pile
Friction bearing pile
Bearing pile
Rough pile

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑