Building Construction The highest line of sloping roof, where two opposite slopes meet, is known as Crown Eave Ridge Rafter Crown Eave Ridge Rafter ANSWER DOWNLOAD EXAMIANS APP
Building Construction Exposed portions of vertical surface at right angles to the door or window frame, are known as Lintels Reveals Jambs Soffits Lintels Reveals Jambs Soffits ANSWER DOWNLOAD EXAMIANS APP
Building Construction The differential settlement in case of foundations on sandy soils should not exceed 40 mm 65 mm 100 mm 25 mm 40 mm 65 mm 100 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Crown is located at Highest point on the extrados of the arch Skew-back of the arch Highest point on the intrados of the arch None of these Highest point on the extrados of the arch Skew-back of the arch Highest point on the intrados of the arch None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 7 days 4 days 1 day 14 days 7 days 4 days 1 day 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Stability of an existing structure may be disturbed by All listed here Mining in the neighborhood Vibrations caused by traffic movements Rising of water table All listed here Mining in the neighborhood Vibrations caused by traffic movements Rising of water table ANSWER DOWNLOAD EXAMIANS APP