• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Building Construction

Building Construction
The highest line of sloping roof, where two opposite slopes meet, is known as

Crown
Eave
Ridge
Rafter

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Exposed portions of vertical surface at right angles to the door or window frame, are known as

Lintels
Reveals
Jambs
Soffits

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The differential settlement in case of foundations on sandy soils should not exceed

40 mm
65 mm
100 mm
25 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Crown is located at

Highest point on the extrados of the arch
Skew-back of the arch
Highest point on the intrados of the arch
None of these

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form work from the sides of beams can be removed only after

7 days
4 days
1 day
14 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Stability of an existing structure may be disturbed by

All listed here
Mining in the neighborhood
Vibrations caused by traffic movements
Rising of water table

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑