Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material Glass strips are driven into the layer according to the pattern required A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material Glass strips are driven into the layer according to the pattern required A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand All listed here A tube of about 2 meters length and 20 cm diameter with a cutting edge A flap valve at the bottom of tube is provided to extract the soil sample The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand All listed here A tube of about 2 meters length and 20 cm diameter with a cutting edge A flap valve at the bottom of tube is provided to extract the soil sample ANSWER DOWNLOAD EXAMIANS APP
Building Construction In horizontal D.P.C, thickness of cement concrete (1 : 2 : 4) is 2 cm 8 cm 6 cm 4 cm 2 cm 8 cm 6 cm 4 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The brick laid with its length parallel to the face of a wall, is a known as Header None of these Stretcher Closer Header None of these Stretcher Closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction In soft clay of low bearing capacity, the type of steel pile generally used, is Screw pile H-pile Disc pile Pipe pile Screw pile H-pile Disc pile Pipe pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction In grillage foundations, distance between flanges of grillage beams, is kept Twice the flange width Maximum of (A), (B) and (C) 40 cm Equal to flange width Twice the flange width Maximum of (A), (B) and (C) 40 cm Equal to flange width ANSWER DOWNLOAD EXAMIANS APP