Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling Glass strips are driven into the layer according to the pattern required A base course is prepared as in cement concrete flooring After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling Glass strips are driven into the layer according to the pattern required A base course is prepared as in cement concrete flooring After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material ANSWER DOWNLOAD EXAMIANS APP
Building Construction An arch constructed with finely dressed stones, is known Gauged arch Rubble arch Axed arch Ashlar arch Gauged arch Rubble arch Axed arch Ashlar arch ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of two surfaces of a sloping roof forming an internal angle less than 180°, is known as Hip None of these Valley Ridge Hip None of these Valley Ridge ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 to 40 mm 25 mm 40 to 65 mm 65 to 100 mm 25 to 40 mm 25 mm 40 to 65 mm 65 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 25 24 18 12 25 24 18 12 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The 19 cm × 9 cm side of a brick as seen in the wall face, is generally known as Front Stretcher Face Header Front Stretcher Face Header ANSWER DOWNLOAD EXAMIANS APP