For constructing a terrazzo floor, Pick up the incorrect statement from the following:

A base course is prepared as in cement concrete flooring
Glass strips are driven into the layer according to the pattern required
A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling
After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In English garden wall bond

The middle course of stretchers is started with a header to give proper vertical joints
One course of headers to three or five course of stretchers
All of these
Queen closer in provided in each heading course