Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: A base course is prepared as in cement concrete flooring A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material Glass strips are driven into the layer according to the pattern required A base course is prepared as in cement concrete flooring A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material Glass strips are driven into the layer according to the pattern required ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Extrados Intrados Spandril Rise Extrados Intrados Spandril Rise ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of piles is determined by Pile load tests All of these Static formula Dynamic formula Pile load tests All of these Static formula Dynamic formula ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of flooring suitable for use in churches, theatres, public libraries and other places where noiseless floor covering is desired is Linoleum flooring Wooden flooring Glass flooring Cork flooring Linoleum flooring Wooden flooring Glass flooring Cork flooring ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of the surfaces of a sloping roof forming an external angle exceeding 180°, is Valley Hip Ridge None of these Valley Hip Ridge None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction In verandah (corridor) floors outward slope is 1 in 60 1 in 40 1 in 50 1 in 70 1 in 60 1 in 40 1 in 50 1 in 70 ANSWER DOWNLOAD EXAMIANS APP