Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material Glass strips are driven into the layer according to the pattern required A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material Glass strips are driven into the layer according to the pattern required ANSWER DOWNLOAD EXAMIANS APP
Building Construction The local swelling of a finished plaster, is termed Blistering Dubbing Cracking Hacking Blistering Dubbing Cracking Hacking ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wooden block hinged on post outside a door, is known Cleat Stop Horn None of these Cleat Stop Horn None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The member which is placed horizontally to support common rafter of a sloping roof, is Purlin Batten Strut Cleat Purlin Batten Strut Cleat ANSWER DOWNLOAD EXAMIANS APP
Building Construction For plastering the exposed brick walls, the cement sand mortar should be 1 : 3 1 : 2 1 : 4 1 : 6 1 : 3 1 : 2 1 : 4 1 : 6 ANSWER DOWNLOAD EXAMIANS APP
Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 4 5 6 3 4 5 6 3 ANSWER DOWNLOAD EXAMIANS APP