Building Construction The line of intersection of the surfaces of a sloping roof forming an external angle exceeding 180°, is Hip Ridge Valley None of these Hip Ridge Valley None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Between ceiling and ground level Upto ceiling from the ground level Between ceiling and floor level Upto roof above ground level Between ceiling and ground level Upto ceiling from the ground level Between ceiling and floor level Upto roof above ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger boring method is not suitable for Cemented soil Very hard soil Vary soft soil All of these Cemented soil Very hard soil Vary soft soil All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 5, 4, 3, 2, 1 2, 1, 3, 5, 4 1, 2, 3, 4, 5 3, 2, 5, 1, 4 5, 4, 3, 2, 1 2, 1, 3, 5, 4 1, 2, 3, 4, 5 3, 2, 5, 1, 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical posts placed at the top and bottom ends of a flight supporting the hand rail are known as Railings Balusters Newel posts Balustrades Railings Balusters Newel posts Balustrades ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Pressure pile Franki pile Vibro pile Simplex pile Pressure pile Franki pile Vibro pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP