Building Construction For effective drainage, the finished surface of flat roof should have a minimum slope of 1 to 50 1 in 20 1 in 5 1 in 10 1 to 50 1 in 20 1 in 5 1 in 10 ANSWER DOWNLOAD EXAMIANS APP
Building Construction An ordinary concrete may be made water proof by adding Pudlo Impermo All of these Snowcem Pudlo Impermo All of these Snowcem ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 1 day 14 days 7 days 4 days 1 day 14 days 7 days 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction According to National Building Code, the hydrants in water mains is provided at minimum interval of 60 m 50 m 75 m 90 m 60 m 50 m 75 m 90 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The voussoir placed at crown of an arch, is known as a Soffit Haunch Springer Key Soffit Haunch Springer Key ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 1, 2, 3, 4, 5 5, 4, 3, 2, 1 3, 2, 5, 1, 4 2, 1, 3, 5, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 3, 2, 5, 1, 4 2, 1, 3, 5, 4 ANSWER DOWNLOAD EXAMIANS APP