Building Construction The process of working a flat for the finishing coat, is known Blistering Knitting Dubbing out Floating Blistering Knitting Dubbing out Floating ANSWER DOWNLOAD EXAMIANS APP
Building Construction The horizontal timber piece provided at the apex of a roof truss which supports the common rafter is called Hip rafter Ridge board Eaves board Valley rafter Hip rafter Ridge board Eaves board Valley rafter ANSWER DOWNLOAD EXAMIANS APP
Building Construction The under surface of an arch, is called Intrados Back Soffit Haunch Intrados Back Soffit Haunch ANSWER DOWNLOAD EXAMIANS APP
Building Construction The width of the hollow space between two walls of a cavity wall should not exceed 5 cm 10 cm 7.5 cm 15 cm 5 cm 10 cm 7.5 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Pressure pile Vibro pile Simplex pile Franki pile Pressure pile Vibro pile Simplex pile Franki pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger boring method is not suitable for All of these Vary soft soil Very hard soil Cemented soil All of these Vary soft soil Very hard soil Cemented soil ANSWER DOWNLOAD EXAMIANS APP