Building Construction The process of working a flat for the finishing coat, is known Blistering Knitting Floating Dubbing out Blistering Knitting Floating Dubbing out ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the commonly adopted geophysical method in civil engineering from the following: The seismic method Both (A) and (B) of the above Electrical resistivity method Gravitational method The seismic method Both (A) and (B) of the above Electrical resistivity method Gravitational method ANSWER DOWNLOAD EXAMIANS APP
Building Construction In which of the following pairs both trees yield soft wood? Chir and sal Sal and teak Chir and deodar Deodar and Shishum Chir and sal Sal and teak Chir and deodar Deodar and Shishum ANSWER DOWNLOAD EXAMIANS APP
Building Construction The taper of precast concrete pile should not be more than 4 cm per metre length 2 cm per metre length 5 cm per metre length 1 cm per metre length 4 cm per metre length 2 cm per metre length 5 cm per metre length 1 cm per metre length ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stone blocks approximately triangular in shape, used as steps, are known None of these Stone steps Spandril steps Built up steps None of these Stone steps Spandril steps Built up steps ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: A flap valve at the bottom of tube is provided to extract the soil sample The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here A flap valve at the bottom of tube is provided to extract the soil sample The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here ANSWER DOWNLOAD EXAMIANS APP