Building Construction The process of working a flat for the finishing coat, is known Blistering Dubbing out Knitting Floating Blistering Dubbing out Knitting Floating ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile which supports the load partly by friction and partly by resting on hard stratum, is called Rough pile Bearing pile Friction pile Friction bearing pile Rough pile Bearing pile Friction pile Friction bearing pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction For effective drainage, the finished surface of flat roof should have a minimum slope of 1 in 5 1 to 50 1 in 20 1 in 10 1 in 5 1 to 50 1 in 20 1 in 10 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The skirting/dado in a bath roof should be upto 200 cm 15 cm above floor level Level of the tap Ceiling 200 cm 15 cm above floor level Level of the tap Ceiling ANSWER DOWNLOAD EXAMIANS APP
Building Construction To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act Neither (A), (B) nor (C) Within the middle fifth of the base At the centre of the base Within the middle third of the base Neither (A), (B) nor (C) Within the middle fifth of the base At the centre of the base Within the middle third of the base ANSWER DOWNLOAD EXAMIANS APP
Building Construction The number of steps in a flight generally should not be less than 2 3 5 No limit 2 3 5 No limit ANSWER DOWNLOAD EXAMIANS APP