The process of working a flat for the finishing coat, is known

Blistering
Dubbing out
Knitting
Floating

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The pile which supports the load partly by friction and partly by resting on hard stratum, is called

Rough pile
Bearing pile
Friction pile
Friction bearing pile

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For effective drainage, the finished surface of flat roof should have a minimum slope of

1 in 5
1 to 50
1 in 20
1 in 10

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The skirting/dado in a bath roof should be upto

200 cm
15 cm above floor level
Level of the tap
Ceiling

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act

Neither (A), (B) nor (C)
Within the middle fifth of the base
At the centre of the base
Within the middle third of the base

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The number of steps in a flight generally should not be less than

2
3
5
No limit

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑