Building Construction The skirting/dado in a bath roof should be upto 15 cm above floor level Ceiling 200 cm Level of the tap 15 cm above floor level Ceiling 200 cm Level of the tap ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.35 du 1.25 du 1.5 du 1.75 du 1.35 du 1.25 du 1.5 du 1.75 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction The floor is rubbed with oxalic acid, for making its surface Uniform Durable Glossy Free from voids Uniform Durable Glossy Free from voids ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wall constructed to resist the pressure of an earth filling, is called Retaining wall Breast wall Buttress Parapet wall Retaining wall Breast wall Buttress Parapet wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple close roof is suitable for maximum span of 5.5 m 3.5 m 4.5 m 2.5 m 5.5 m 3.5 m 4.5 m 2.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The entrained concrete is used in lining walls and roofs for making Neither (A) nor (B) Both (A) and (B) Sound insulated Heat insulated Neither (A) nor (B) Both (A) and (B) Sound insulated Heat insulated ANSWER DOWNLOAD EXAMIANS APP