Building Construction The skirting/dado in a bath roof should be upto Level of the tap 15 cm above floor level 200 cm Ceiling Level of the tap 15 cm above floor level 200 cm Ceiling ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Intrados Rise Spandril Extrados Intrados Rise Spandril Extrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 18 12 25 24 18 12 25 24 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical members fixed between steps and hand rail, are known Soffits Newel posts Balusters Strings Soffits Newel posts Balusters Strings ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement made to support an unsafe structure temporarily, is known as Underpinning Scaffolding Shoring Jacking Underpinning Scaffolding Shoring Jacking ANSWER DOWNLOAD EXAMIANS APP
Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required ANSWER DOWNLOAD EXAMIANS APP