Building Construction The skirting/dado in a bath roof should be upto 15 cm above floor level Level of the tap Ceiling 200 cm 15 cm above floor level Level of the tap Ceiling 200 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 14 days 7 days 4 days 1 day 14 days 7 days 4 days 1 day ANSWER DOWNLOAD EXAMIANS APP
Building Construction The projections of head or sill of a door or window frame are Transoms Chocks Stops Horns Transoms Chocks Stops Horns ANSWER DOWNLOAD EXAMIANS APP
Building Construction In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used Pedestal pile Franki pile Vibro pile Pressure pile Pedestal pile Franki pile Vibro pile Pressure pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction While designing a stair, the product of rise and going is approximately kept equal to 450 420 350 500 450 420 350 500 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of Raymond pile Lengths vary from 6 m to 12 m Diameter of top of piles varies from 40 cm to 60 cm All listed here Diameter of pile at bottom varies from 20 cm to 28 cm Lengths vary from 6 m to 12 m Diameter of top of piles varies from 40 cm to 60 cm All listed here Diameter of pile at bottom varies from 20 cm to 28 cm ANSWER DOWNLOAD EXAMIANS APP