Building Construction The skirting/dado in a bath roof should be upto Ceiling 200 cm Level of the tap 15 cm above floor level Ceiling 200 cm Level of the tap 15 cm above floor level ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: All listed here Distance of C.G. of the loads from the smaller column = 3.00 m The length of the foundation slab = 7.00 m Area of footing slab = 11.00 m2 All listed here Distance of C.G. of the loads from the smaller column = 3.00 m The length of the foundation slab = 7.00 m Area of footing slab = 11.00 m2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dado is usually provided in Bath rooms Verandah (belcony) Living rooms Dining halls Bath rooms Verandah (belcony) Living rooms Dining halls ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 2, 1, 3, 5, 4 5, 4, 3, 2, 1 3, 2, 5, 1, 4 1, 2, 3, 4, 5 2, 1, 3, 5, 4 5, 4, 3, 2, 1 3, 2, 5, 1, 4 1, 2, 3, 4, 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 12 25 24 18 12 25 24 18 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 to 40 mm 65 to 100 mm 40 to 65 mm 25 mm 25 to 40 mm 65 to 100 mm 40 to 65 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP