Building Construction The skirting/dado in a bath roof should be upto Ceiling Level of the tap 15 cm above floor level 200 cm Ceiling Level of the tap 15 cm above floor level 200 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For brick construction, the lime-sand mortar, is 1 : 3 1 : 1 1 : 2 1 : 4 1 : 3 1 : 1 1 : 2 1 : 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wall constructed to resist the pressure of an earth filling, is called Breast wall Parapet wall Buttress Retaining wall Breast wall Parapet wall Buttress Retaining wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of keeping concrete moist for a certain period after its finishing, is known as Finishing of concrete Placing of concrete Compaction of concrete Curing of concrete Finishing of concrete Placing of concrete Compaction of concrete Curing of concrete ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stone whose crushing strength is maximum, is Chalk Slate Sand stone Granite Chalk Slate Sand stone Granite ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for isolated foundations on clayey soils should be limited to 40 mm 65 mm 25 mm 100 mm 40 mm 65 mm 25 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP