Building Construction The skirting/dado in a bath roof should be upto 15 cm above floor level 200 cm Level of the tap Ceiling 15 cm above floor level 200 cm Level of the tap Ceiling ANSWER DOWNLOAD EXAMIANS APP
Building Construction Engineering news formula for obtaining safe bearing capacity of pile for drop hammer, is, Q = Wh/6 (S + 2.5) Q = (W × 6)/h (S + 2.5) Q = Wh/2.5 (S + 6) Q = (W × 2.5)/6 (S + h) Q = Wh/6 (S + 2.5) Q = (W × 6)/h (S + 2.5) Q = Wh/2.5 (S + 6) Q = (W × 2.5)/6 (S + h) ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Peeling Blistering Hacking Dubbing Peeling Blistering Hacking Dubbing ANSWER DOWNLOAD EXAMIANS APP
Building Construction In English garden wall bond All of these The middle course of stretchers is started with a header to give proper vertical joints Queen closer in provided in each heading course One course of headers to three or five course of stretchers All of these The middle course of stretchers is started with a header to give proper vertical joints Queen closer in provided in each heading course One course of headers to three or five course of stretchers ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 1 day 14 days 4 days 7 days 1 day 14 days 4 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction In verandah (corridor) floors outward slope is 1 in 40 1 in 50 1 in 60 1 in 70 1 in 40 1 in 50 1 in 60 1 in 70 ANSWER DOWNLOAD EXAMIANS APP