Building Construction The skirting/dado in a bath roof should be upto Level of the tap 200 cm 15 cm above floor level Ceiling Level of the tap 200 cm 15 cm above floor level Ceiling ANSWER DOWNLOAD EXAMIANS APP
Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 20 % 25 % 15 % 10 % 20 % 25 % 15 % 10 % ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut along the centre of width in such a way that its length is equal to that of full brick, is called Queen closer Bevelled closer King closer Half brick Queen closer Bevelled closer King closer Half brick ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil can be improved by Increasing the depth of foundation Compacting the soil Draining the soil Grouting Increasing the depth of foundation Compacting the soil Draining the soil Grouting ANSWER DOWNLOAD EXAMIANS APP
Building Construction The width of the hollow space between two walls of a cavity wall should not exceed 15 cm 7.5 cm 5 cm 10 cm 15 cm 7.5 cm 5 cm 10 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For each storey (or, story) of a building, the depth of exploration should be 2 meters 3 meters 1 meter 4 meters 2 meters 3 meters 1 meter 4 meters ANSWER DOWNLOAD EXAMIANS APP