Building Construction The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed 15 m 5 m 20 m 10 m 15 m 5 m 20 m 10 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The wedge shaped bricks forming an arch ring, are called Voussoirs Haunches Spandrils Soffits Voussoirs Haunches Spandrils Soffits ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of keeping concrete moist for a certain period after its finishing, is known as Compaction of concrete Finishing of concrete Curing of concrete Placing of concrete Compaction of concrete Finishing of concrete Curing of concrete Placing of concrete ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Rise Extrados Spandril Intrados Rise Extrados Spandril Intrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of bond in which every course contains both headers and stretchers, is called Mixed bond English bond Russian bond Flemish bond Mixed bond English bond Russian bond Flemish bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bond in which headers and stretchers are laid in alternate courses and every stretcher course is started with a three fourth brick bat, is known as Rat-trap bond Dutch bond English cross bond Monk bond Rat-trap bond Dutch bond English cross bond Monk bond ANSWER DOWNLOAD EXAMIANS APP