Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Extrados Intrados Rise Spandril Extrados Intrados Rise Spandril ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/6th of the span 1/8th of the span 1/12th of the span 1/10th of the span 1/6th of the span 1/8th of the span 1/12th of the span 1/10th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 1, 2, 3, 4, 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of joint commonly used at the junction of a principal rafter and tie beam in timber trusses is Butt joint Oblique mortise and tenon joint Mitred joint Mortise and tenon joint Butt joint Oblique mortise and tenon joint Mitred joint Mortise and tenon joint ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct statement about silt soil from the following: All listed here The silt soil has particle size from 0.02 mm to 0.06 mm The least plastic type normally consists of more or less equidimensional grains of quartz In organic fine grained silt soil possesses no plasticity All listed here The silt soil has particle size from 0.02 mm to 0.06 mm The least plastic type normally consists of more or less equidimensional grains of quartz In organic fine grained silt soil possesses no plasticity ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel ANSWER DOWNLOAD EXAMIANS APP