Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Extrados Intrados Rise Spandril Extrados Intrados Rise Spandril ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of excavation of foundations, is generally measured with a Levelling staff Boning rod Steel tape Ranging rod Levelling staff Boning rod Steel tape Ranging rod ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct statement about silt soil from the following: All listed here In organic fine grained silt soil possesses no plasticity The silt soil has particle size from 0.02 mm to 0.06 mm The least plastic type normally consists of more or less equidimensional grains of quartz All listed here In organic fine grained silt soil possesses no plasticity The silt soil has particle size from 0.02 mm to 0.06 mm The least plastic type normally consists of more or less equidimensional grains of quartz ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 to 40 mm 65 to 100 mm 40 to 65 mm 25 mm 25 to 40 mm 65 to 100 mm 40 to 65 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile provided with one or more bulles in its vertical shaft, is generally known as Friction pile Under-ream pile Sheet pile Bearing pile Friction pile Under-ream pile Sheet pile Bearing pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.35 du 1.5 du 1.75 du 1.25 du 1.35 du 1.5 du 1.75 du 1.25 du ANSWER DOWNLOAD EXAMIANS APP