Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Spandril Rise Extrados Intrados Spandril Rise Extrados Intrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as Bat Stretcher Header Closer Bat Stretcher Header Closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The construction joints in buildings are provided after 20 m 40 m 10 m 15 m 20 m 40 m 10 m 15 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of pile which is driven at an inclination to resist inclined forces is known as Friction pile Anchor pile Sheet pile Batter pile Friction pile Anchor pile Sheet pile Batter pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundation which consists of a thick reinforced cement slab covering whole area to support heavy concentrated structural loads, is known as Raft footing Strap footing Combined footing None of these Raft footing Strap footing Combined footing None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction In flat roof of reinforced cement concrete, the recommended angle of slope, is 10° Zero 200° A few degrees 10° Zero 200° A few degrees ANSWER DOWNLOAD EXAMIANS APP