The vertical distance between the springing line and highest point of the inner curve of an arch is known as

Spandril
Intrados
Extrados
Rise

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form Work including the props can be removed from beams, only after

7 days
21 days
14 days
3 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Couple roof is used for spans

3.5 m but less than 5 m
6.5 m but less than 8 m
3.5 m or less
5 m but less than 6.5 m

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The window which projects outside a room of a building for admitting more light and air, is known

Bay window
Lantern window
Casement window
Dormer window

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The depth of excavation of foundations, is generally measured with a

Steel tape
Ranging rod
Levelling staff
Boning rod

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The maximum total settlement for isolated foundations on clayey soils should be limited to

25 mm
40 mm
65 mm
100 mm

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑