Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Extrados Rise Intrados Spandril Extrados Rise Intrados Spandril ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger boring method is not suitable for Vary soft soil Cemented soil Very hard soil All of these Vary soft soil Cemented soil Very hard soil All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the construction of arches, sand box method is used for Centring Striking of centring Actual laying of arch work None of these Centring Striking of centring Actual laying of arch work None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.5 du 1.25 du 1.35 du 1.75 du 1.5 du 1.25 du 1.35 du 1.75 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction While investigating the site, a thick layer of fairly firm clay over a deep layer of soft clay is encountered. In such a situation, the following type of foundation is useful: Pile formation Grillage foundation Raft foundation None of these Pile formation Grillage foundation Raft foundation None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Terrazzo floor Chips floor Marble floor Mosaic floor Terrazzo floor Chips floor Marble floor Mosaic floor ANSWER DOWNLOAD EXAMIANS APP