Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Intrados Extrados Rise Spandril Intrados Extrados Rise Spandril ANSWER DOWNLOAD EXAMIANS APP
Building Construction The nominal thickness of one brick wall in mm, is 150 mm 90 mm 190 mm 200 mm 150 mm 90 mm 190 mm 200 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 7 days 4 days 1 day 14 days 7 days 4 days 1 day 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of two surfaces of a sloping roof forming an internal angle less than 180°, is known as Ridge Hip None of these Valley Ridge Hip None of these Valley ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Upto roof above ground level Between ceiling and ground level Upto ceiling from the ground level Between ceiling and floor level Upto roof above ground level Between ceiling and ground level Upto ceiling from the ground level Between ceiling and floor level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum depth of foundation in clayey soils is 0.9 m 0.5 m 0.7 m 1.2 m 0.9 m 0.5 m 0.7 m 1.2 m ANSWER DOWNLOAD EXAMIANS APP