Building Construction The depth of excavation of foundations, is generally measured with a Boning rod Ranging rod Steel tape Levelling staff Boning rod Ranging rod Steel tape Levelling staff ANSWER DOWNLOAD EXAMIANS APP
Building Construction The rock formed from the solidification of molten matter (magma) is called: Igneous rock None of these Sedimentary rock Metamorphic rock Igneous rock None of these Sedimentary rock Metamorphic rock ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand All listed here A flap valve at the bottom of tube is provided to extract the soil sample A tube of about 2 meters length and 20 cm diameter with a cutting edge The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand All listed here A flap valve at the bottom of tube is provided to extract the soil sample A tube of about 2 meters length and 20 cm diameter with a cutting edge ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 5 to 10 cm 25 to 30 cm 15 to 20 cm 30 to 45 cm 5 to 10 cm 25 to 30 cm 15 to 20 cm 30 to 45 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The dimensions of a half queen closer, are 9 cm × 9 cm × 4.5 cm 1.8 cm × 4.5 cm × 9 cm 9 cm × 9 cm × 9 cm 9 cm × 4.5 cm × 9 cm 9 cm × 9 cm × 4.5 cm 1.8 cm × 4.5 cm × 9 cm 9 cm × 9 cm × 9 cm 9 cm × 4.5 cm × 9 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The alignment of a cross joint along the plumb line is Bed block Perpend Lintel Vertical line Bed block Perpend Lintel Vertical line ANSWER DOWNLOAD EXAMIANS APP