Building Construction The depth of excavation of foundations, is generally measured with a Ranging rod Steel tape Levelling staff Boning rod Ranging rod Steel tape Levelling staff Boning rod ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of multi-storeyed buildings, the forms to be removed first are Sides of beams and girders All the above at the same time Bottom of beams and girders Column forms Sides of beams and girders All the above at the same time Bottom of beams and girders Column forms ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Pressure pile Franki pile Simplex pile Vibro pile Pressure pile Franki pile Simplex pile Vibro pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dado is usually provided in Dining halls Living rooms Verandah (belcony) Bath rooms Dining halls Living rooms Verandah (belcony) Bath rooms ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lower half portion between crown and skew back of the arch, is called Springing Soffit Haunch Spandril Springing Soffit Haunch Spandril ANSWER DOWNLOAD EXAMIANS APP
Building Construction A pre-stressed concrete pile is Easy to handle All of these Lighter in weight Extremely durable Easy to handle All of these Lighter in weight Extremely durable ANSWER DOWNLOAD EXAMIANS APP