Building Construction

Building Construction
The depth of excavation of foundations, is generally measured with a

Levelling staff
Steel tape
Boning rod
Ranging rod

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
According to National Building Code, the hydrants in water mains is provided at minimum interval of

75 m
60 m
90 m
50 m

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The taper of precast concrete pile should not be more than

2 cm per metre length
4 cm per metre length
5 cm per metre length
1 cm per metre length

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Weep holes are provided in retaining and breast walls

To increase compaction of the earth retained
To add architectural beauty
To drain off the water from the filling
To ventilate the stone masonry

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Number of vertical joints in a stretcher course is x times the number of joints in the header course, where x is equal to

1
1/2
2
1/4

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
While designing a stair, the product of rise and going is approximately kept equal to

350
420
450
500

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑