Building Construction The depth of excavation of foundations, is generally measured with a Boning rod Ranging rod Levelling staff Steel tape Boning rod Ranging rod Levelling staff Steel tape ANSWER DOWNLOAD EXAMIANS APP
Building Construction A cut in frame of a door to receive the shutter, is called Stop Rebate Louver Horn Stop Rebate Louver Horn ANSWER DOWNLOAD EXAMIANS APP
Building Construction The size of a floor tile commonly used, is 20 cm × 20 cm × 2 cm 15 cm × 15 cm × 1.8 cm All listed here 22.5 × 22.5 cm × 2.2 cm 20 cm × 20 cm × 2 cm 15 cm × 15 cm × 1.8 cm All listed here 22.5 × 22.5 cm × 2.2 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as Stretcher Bat Closer Header Stretcher Bat Closer Header ANSWER DOWNLOAD EXAMIANS APP
Building Construction For brick construction, the lime-sand mortar, is 1 : 1 1 : 3 1 : 4 1 : 2 1 : 1 1 : 3 1 : 4 1 : 2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction An arch constructed with finely dressed stones, is known Axed arch Rubble arch Gauged arch Ashlar arch Axed arch Rubble arch Gauged arch Ashlar arch ANSWER DOWNLOAD EXAMIANS APP