Building Construction The depth of excavation of foundations, is generally measured with a Steel tape Levelling staff Boning rod Ranging rod Steel tape Levelling staff Boning rod Ranging rod ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to 40 mm 20 mm 30 mm 10 mm 40 mm 20 mm 30 mm 10 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stone blocks approximately triangular in shape, used as steps, are known Spandril steps Stone steps Built up steps None of these Spandril steps Stone steps Built up steps None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of multi-storeyed buildings, the forms to be removed first are Sides of beams and girders Column forms All the above at the same time Bottom of beams and girders Sides of beams and girders Column forms All the above at the same time Bottom of beams and girders ANSWER DOWNLOAD EXAMIANS APP
Building Construction Auger boring Is most economical up-to a depth of 5 meters All of these Is the most primitive method for making a hole in the ground Is generally employed in cohesive and other self soils above water table Is most economical up-to a depth of 5 meters All of these Is the most primitive method for making a hole in the ground Is generally employed in cohesive and other self soils above water table ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided on a sloping roof of a building, is called Louvered window Rash window Lantern window Dormer window Louvered window Rash window Lantern window Dormer window ANSWER DOWNLOAD EXAMIANS APP