Building Construction A floor constructed with the 4 to 6 mm marble chips, is known Chip floor Terrazzo floor Marble floor Reinforced marble floor Chip floor Terrazzo floor Marble floor Reinforced marble floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction During percussion drilling The soil to a considerable depth below the bottom of the hole gets disturbed Caving or mixing of strata are caused in soft soils or cohesion-less soils All listed here Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole The soil to a considerable depth below the bottom of the hole gets disturbed Caving or mixing of strata are caused in soft soils or cohesion-less soils All listed here Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundation is generally provided if soil is Water logged All listed here Compressible Made up Water logged All listed here Compressible Made up ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A flap valve at the bottom of tube is provided to extract the soil sample A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A flap valve at the bottom of tube is provided to extract the soil sample ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth or height of the arch is the Perpendicular distance between springing line and extrados Perpendicular distance between intrados and extrados Vertical distance between springing line and intrados None of these Perpendicular distance between springing line and extrados Perpendicular distance between intrados and extrados Vertical distance between springing line and intrados None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction In any good staircase, the maximum and minimum pitch respectively should be 60° and 10° 90° and 0° 40° and 25° 75° and 30° 60° and 10° 90° and 0° 40° and 25° 75° and 30° ANSWER DOWNLOAD EXAMIANS APP