Building Construction Couple roof is used for spans 3.5 m or less 3.5 m but less than 5 m 6.5 m but less than 8 m 5 m but less than 6.5 m 3.5 m or less 3.5 m but less than 5 m 6.5 m but less than 8 m 5 m but less than 6.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: All listed here A tube of about 2 meters length and 20 cm diameter with a cutting edge A flap valve at the bottom of tube is provided to extract the soil sample The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand All listed here A tube of about 2 meters length and 20 cm diameter with a cutting edge A flap valve at the bottom of tube is provided to extract the soil sample The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand ANSWER DOWNLOAD EXAMIANS APP
Building Construction The floor is rubbed with oxalic acid, for making its surface Durable Free from voids Glossy Uniform Durable Free from voids Glossy Uniform ANSWER DOWNLOAD EXAMIANS APP
Building Construction A cut in frame of a door to receive the shutter, is called Louver Rebate Horn Stop Louver Rebate Horn Stop ANSWER DOWNLOAD EXAMIANS APP
Building Construction The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed 15 m 5 m 10 m 20 m 15 m 5 m 10 m 20 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The additional piles which are driven to increase the capacity of supporting loads on vertical piles, are known Raking piles Sinking piles Construction piles Eccentric piles Raking piles Sinking piles Construction piles Eccentric piles ANSWER DOWNLOAD EXAMIANS APP