Building Construction The width of the hollow space between two walls of a cavity wall should not exceed 7.5 cm 5 cm 15 cm 10 cm 7.5 cm 5 cm 15 cm 10 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Stability of an existing structure may be disturbed by All listed here Mining in the neighborhood Rising of water table Vibrations caused by traffic movements All listed here Mining in the neighborhood Rising of water table Vibrations caused by traffic movements ANSWER DOWNLOAD EXAMIANS APP
Building Construction The projections of head or sill of a door or window frame are Transoms Chocks Horns Stops Transoms Chocks Horns Stops ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut along the centre of width in such a way that its length is equal to that of full brick, is called King closer Queen closer Bevelled closer Half brick King closer Queen closer Bevelled closer Half brick ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 65 to 100 mm 25 to 40 mm 40 to 65 mm 25 mm 65 to 100 mm 25 to 40 mm 40 to 65 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the construction of arches, sand box method is used for Striking of centring None of these Actual laying of arch work Centring Striking of centring None of these Actual laying of arch work Centring ANSWER DOWNLOAD EXAMIANS APP