Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 35 mm 25 mm 15 mm 45 mm 35 mm 25 mm 15 mm 45 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement made to support an unsafe structure temporarily, is known as Underpinning Shoring Scaffolding Jacking Underpinning Shoring Scaffolding Jacking ANSWER DOWNLOAD EXAMIANS APP
Building Construction The radial splits which are wider on the outside of the log and narrower towards the pith are known as Rindgalls Heart shakes Starshakes Cupshakes Rindgalls Heart shakes Starshakes Cupshakes ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of an arch is the distance between Intrados and extrados Crown and ground level Ground level and springing line Crown and springing line Intrados and extrados Crown and ground level Ground level and springing line Crown and springing line ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of multi-storeyed buildings, the forms to be removed first are Bottom of beams and girders Column forms Sides of beams and girders All the above at the same time Bottom of beams and girders Column forms Sides of beams and girders All the above at the same time ANSWER DOWNLOAD EXAMIANS APP
Building Construction For a wall carrying heavy load on low bearing capacity soil, Thick concrete bed is provided Both (A) and (C) of the above Reinforced concrete bed is provided Lean concrete bed is provided Thick concrete bed is provided Both (A) and (C) of the above Reinforced concrete bed is provided Lean concrete bed is provided ANSWER DOWNLOAD EXAMIANS APP