Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 15 mm 45 mm 25 mm 35 mm 15 mm 45 mm 25 mm 35 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction A pre-stressed concrete pile is All of these Extremely durable Easy to handle Lighter in weight All of these Extremely durable Easy to handle Lighter in weight ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundations are suitable for Multi-storeyed buildings Water logged soils Soft rocks Compact soils Multi-storeyed buildings Water logged soils Soft rocks Compact soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 3 days 7 days 21 days 14 days 3 days 7 days 21 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A base course is prepared as in cement concrete flooring A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A base course is prepared as in cement concrete flooring ANSWER DOWNLOAD EXAMIANS APP
Building Construction The triangular portion between any two adjacent arches and the tangent to their crowns, is Rise Soffit Spandril Haunch Rise Soffit Spandril Haunch ANSWER DOWNLOAD EXAMIANS APP