Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 45 mm 15 mm 25 mm 35 mm 45 mm 15 mm 25 mm 35 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: Distance of C.G. of the loads from the smaller column = 3.00 m The length of the foundation slab = 7.00 m Area of footing slab = 11.00 m2 All listed here Distance of C.G. of the loads from the smaller column = 3.00 m The length of the foundation slab = 7.00 m Area of footing slab = 11.00 m2 All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The local swelling of a finished plaster, is termed Dubbing Cracking Blistering Hacking Dubbing Cracking Blistering Hacking ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dampness causes Bleaching of paints Growth of termites Efflorescence Crumbling of plaster Bleaching of paints Growth of termites Efflorescence Crumbling of plaster ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement made to support an unsafe structure temporarily, is known as Scaffolding Shoring Jacking Underpinning Scaffolding Shoring Jacking Underpinning ANSWER DOWNLOAD EXAMIANS APP
Building Construction The least bearing capacity of soil is that of Hard rock Moist clay Coarse sandy soil Soft rock Hard rock Moist clay Coarse sandy soil Soft rock ANSWER DOWNLOAD EXAMIANS APP