Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 35 mm 15 mm 45 mm 25 mm 35 mm 15 mm 45 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Negative skin friction Neither (A) not (B) Develops due to lowering of ground water Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile Both (A) and (B) Neither (A) not (B) Develops due to lowering of ground water Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile Both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 7 days 14 days 21 days 3 days 7 days 14 days 21 days 3 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The triangular portion between any two adjacent arches and the tangent to their crowns, is Haunch Rise Soffit Spandril Haunch Rise Soffit Spandril ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundations are suitable for Water logged soils Compact soils Soft rocks Multi-storeyed buildings Water logged soils Compact soils Soft rocks Multi-storeyed buildings ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 to 40 mm 25 mm 40 to 65 mm 65 to 100 mm 25 to 40 mm 25 mm 40 to 65 mm 65 to 100 mm ANSWER DOWNLOAD EXAMIANS APP