Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 35 mm 15 mm 45 mm 25 mm 35 mm 15 mm 45 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The differential settlement in case of foundations on sandy soils should not exceed 65 mm 100 mm 40 mm 25 mm 65 mm 100 mm 40 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct statements from the following: Cracks appear on the plastered surface in the form of hair cracks In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Excessive thermal variations in the backing or plaster causes the plaster to fall All listed here Cracks appear on the plastered surface in the form of hair cracks In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Excessive thermal variations in the backing or plaster causes the plaster to fall All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Pressure pile Vibro pile Franki pile Simplex pile Pressure pile Vibro pile Franki pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement of supporting an existing structure by providing supports underneath, is known as Shoring Jacking Underpinning Piling Shoring Jacking Underpinning Piling ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/8th of the span 1/10th of the span 1/6th of the span 1/12th of the span 1/8th of the span 1/10th of the span 1/6th of the span 1/12th of the span ANSWER DOWNLOAD EXAMIANS APP