Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 25 mm 15 mm 45 mm 35 mm 25 mm 15 mm 45 mm 35 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of arch used for high class buildings where appearance is of prime importance, is known as Gauged brick arch Rubble arch Ashlar arch Axed brick arch Gauged brick arch Rubble arch Ashlar arch Axed brick arch ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement of supporting an existing structure by providing supports underneath, is known as Jacking Underpinning Shoring Piling Jacking Underpinning Shoring Piling ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 4 days 1 day 14 days 7 days 4 days 1 day 14 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct specification of one-room quarters generally adopted from the following: The front verandah is kept 2 m wide Six quarters in a row All listed here The size of room is either 3.5 m × 3 m or 4.2 m × 2.5 m The front verandah is kept 2 m wide Six quarters in a row All listed here The size of room is either 3.5 m × 3 m or 4.2 m × 2.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lower half portion between crown and skew back of the arch, is called Soffit Spandril Springing Haunch Soffit Spandril Springing Haunch ANSWER DOWNLOAD EXAMIANS APP