Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 25 mm 15 mm 35 mm 45 mm 25 mm 15 mm 35 mm 45 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept 10 cm Less than its projection beyond wall base 15 cm Equal to its projection beyond wall base 10 cm Less than its projection beyond wall base 15 cm Equal to its projection beyond wall base ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of pointing in which a V-shaped projection outside the wall surface, is provided, is called Recessed pointing V-pointing Tuck pointing Weather pointing Recessed pointing V-pointing Tuck pointing Weather pointing ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here A flap valve at the bottom of tube is provided to extract the soil sample The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here A flap valve at the bottom of tube is provided to extract the soil sample ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical posts placed at the top and bottom ends of a flight supporting the hand rail are known as Newel posts Balustrades Railings Balusters Newel posts Balustrades Railings Balusters ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 14 days 7 days 4 days 1 day 14 days 7 days 4 days 1 day ANSWER DOWNLOAD EXAMIANS APP