Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 15 mm 45 mm 35 mm 25 mm 15 mm 45 mm 35 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement made to support an unsafe structure temporarily, is known as Underpinning Jacking Scaffolding Shoring Underpinning Jacking Scaffolding Shoring ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with the 4 to 6 mm marble chips, is known Marble floor Terrazzo floor Chip floor Reinforced marble floor Marble floor Terrazzo floor Chip floor Reinforced marble floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.75 du 1.35 du 1.25 du 1.5 du 1.75 du 1.35 du 1.25 du 1.5 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act Neither (A), (B) nor (C) At the centre of the base Within the middle third of the base Within the middle fifth of the base Neither (A), (B) nor (C) At the centre of the base Within the middle third of the base Within the middle fifth of the base ANSWER DOWNLOAD EXAMIANS APP
Building Construction In high mountainous region, the type of roof generally recommended for buildings, is Mansard type Gambrel type Gable type Shed type Mansard type Gambrel type Gable type Shed type ANSWER DOWNLOAD EXAMIANS APP