Building Construction According to Rankine's formula, minimum depth of foundations, is (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)] (P/2w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)] (P/2w) × [(1 - sin φ)/(1 + sin φ)]² ANSWER DOWNLOAD EXAMIANS APP
Building Construction The width of the hollow space between two walls of a cavity wall should not exceed 10 cm 5 cm 7.5 cm 15 cm 10 cm 5 cm 7.5 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct statements from the following: In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Cracks appear on the plastered surface in the form of hair cracks Excessive thermal variations in the backing or plaster causes the plaster to fall All listed here In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Cracks appear on the plastered surface in the form of hair cracks Excessive thermal variations in the backing or plaster causes the plaster to fall All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required ANSWER DOWNLOAD EXAMIANS APP
Building Construction The local swelling of a finished plaster, is termed Dubbing Blistering Hacking Cracking Dubbing Blistering Hacking Cracking ANSWER DOWNLOAD EXAMIANS APP
Building Construction The skirting/dado in a bath roof should be upto Ceiling 200 cm 15 cm above floor level Level of the tap Ceiling 200 cm 15 cm above floor level Level of the tap ANSWER DOWNLOAD EXAMIANS APP