Building Construction Weep holes are provided in retaining and breast walls To drain off the water from the filling To add architectural beauty To increase compaction of the earth retained To ventilate the stone masonry To drain off the water from the filling To add architectural beauty To increase compaction of the earth retained To ventilate the stone masonry ANSWER DOWNLOAD EXAMIANS APP
Building Construction In any good staircase, the maximum and minimum pitch respectively should be 60° and 10° 90° and 0° 40° and 25° 75° and 30° 60° and 10° 90° and 0° 40° and 25° 75° and 30° ANSWER DOWNLOAD EXAMIANS APP
Building Construction If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then None of these d = 0.445 a d = 0.557 a d = 0.775 a None of these d = 0.445 a d = 0.557 a d = 0.775 a ANSWER DOWNLOAD EXAMIANS APP
Building Construction The thickness of a reinforced brick partition wall, is generally kept 20 cm 10 cm 5 cm 15 cm 20 cm 10 cm 5 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 40 to 65 mm 65 to 100 mm 25 to 40 mm 25 mm 40 to 65 mm 65 to 100 mm 25 to 40 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction While designing a stair, the product of rise and going is approximately kept equal to 450 420 350 500 450 420 350 500 ANSWER DOWNLOAD EXAMIANS APP