Building Construction A stair should not have pitch more than 40° 30° 25° 50° 40° 30° 25° 50° ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 5, 4, 3, 2, 1 3, 2, 5, 1, 4 2, 1, 3, 5, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 3, 2, 5, 1, 4 2, 1, 3, 5, 4 1, 2, 3, 4, 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of multi-storeyed buildings, the forms to be removed first are Sides of beams and girders All the above at the same time Bottom of beams and girders Column forms Sides of beams and girders All the above at the same time Bottom of beams and girders Column forms ANSWER DOWNLOAD EXAMIANS APP
Building Construction Weep holes are provided in retaining and breast walls To drain off the water from the filling To increase compaction of the earth retained To add architectural beauty To ventilate the stone masonry To drain off the water from the filling To increase compaction of the earth retained To add architectural beauty To ventilate the stone masonry ANSWER DOWNLOAD EXAMIANS APP
Building Construction For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than h 2 h h/4 1/2h h 2 h h/4 1/2h ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundation in which a cantilever beam is provided to join two footings, is known as Combined footing Strip footing Strap footing Raft footing Combined footing Strip footing Strap footing Raft footing ANSWER DOWNLOAD EXAMIANS APP