Building Construction Depth or height of the arch is the Vertical distance between springing line and intrados Perpendicular distance between springing line and extrados Perpendicular distance between intrados and extrados None of these Vertical distance between springing line and intrados Perpendicular distance between springing line and extrados Perpendicular distance between intrados and extrados None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum width of a stair in residential buildings, is 55 cm 100 cm 70 cm 85 cm 55 cm 100 cm 70 cm 85 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical member running through middle of a shutter frame, is Reveal Mullion Post Style Reveal Mullion Post Style ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of keeping concrete moist for a certain period after its finishing, is known as Placing of concrete Curing of concrete Compaction of concrete Finishing of concrete Placing of concrete Curing of concrete Compaction of concrete Finishing of concrete ANSWER DOWNLOAD EXAMIANS APP
Building Construction A solid core of rock is formed inside the cylinder in the case of Diamond drilling Wash boring Auger boring Percussion drilling Diamond drilling Wash boring Auger boring Percussion drilling ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A flap valve at the bottom of tube is provided to extract the soil sample A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A flap valve at the bottom of tube is provided to extract the soil sample ANSWER DOWNLOAD EXAMIANS APP