Building Construction Depth or height of the arch is the Vertical distance between springing line and intrados Perpendicular distance between springing line and extrados None of these Perpendicular distance between intrados and extrados Vertical distance between springing line and intrados Perpendicular distance between springing line and extrados None of these Perpendicular distance between intrados and extrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of the surfaces of a sloping roof forming an external angle exceeding 180°, is Ridge None of these Valley Hip Ridge None of these Valley Hip ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger borings are not common In cohesive soils In soft soils None of these In soils that require lateral support In cohesive soils In soft soils None of these In soils that require lateral support ANSWER DOWNLOAD EXAMIANS APP
Building Construction The construction joints in buildings are provided after 15 m 20 m 40 m 10 m 15 m 20 m 40 m 10 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided on a sloping roof of a building, is called Rash window Dormer window Louvered window Lantern window Rash window Dormer window Louvered window Lantern window ANSWER DOWNLOAD EXAMIANS APP
Building Construction Suitable spacing of timber piles, is 80 cm 100 cm 90 cm 70 cm 80 cm 100 cm 90 cm 70 cm ANSWER DOWNLOAD EXAMIANS APP