Building Construction
Gravels

All listed here
Are cohesionless aggregates
Never swell when they come into contact with water
Vary in size between 2 to 20 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In the method of tube boring of soil investigation, the following is essential:

A flap valve at the bottom of tube is provided to extract the soil sample
All listed here
A tube of about 2 meters length and 20 cm diameter with a cutting edge
The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand

ANSWER DOWNLOAD EXAMIANS APP