Building Construction The vertical posts placed at the top and bottom ends of a flight supporting the hand rail are known as Balustrades Railings Newel posts Balusters Balustrades Railings Newel posts Balusters ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the construction of arches, sand box method is used for Centring Actual laying of arch work Striking of centring None of these Centring Actual laying of arch work Striking of centring None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Sum of tread and rise must lie between 600 to 650 mm 300 to 350 mm 500 to 550 mm 400 to 450 mm 600 to 650 mm 300 to 350 mm 500 to 550 mm 400 to 450 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for foundations, is 25 to 50 mm 30 to 125 mm 50 to 100 mm 75 to 125 mm 25 to 50 mm 30 to 125 mm 50 to 100 mm 75 to 125 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Dubbing Hacking Blistering Peeling Dubbing Hacking Blistering Peeling ANSWER DOWNLOAD EXAMIANS APP
Building Construction Number of vertical joints in a stretcher course is x times the number of joints in the header course, where x is equal to 1/2 2 1 1/4 1/2 2 1 1/4 ANSWER DOWNLOAD EXAMIANS APP