Building Construction The foundations are placed below ground level, to increase Workability Strength All listed here Stability of structure Workability Strength All listed here Stability of structure ANSWER DOWNLOAD EXAMIANS APP
Building Construction The rock formed from the solidification of molten matter (magma) is called: Igneous rock Sedimentary rock Metamorphic rock None of these Igneous rock Sedimentary rock Metamorphic rock None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The steel pile which is generally sunk in soft clay or loose sand of low bearing capacity, is Pipe pile Disc pile Screw pile H-pile Pipe pile Disc pile Screw pile H-pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 3 days 7 days 21 days 14 days 3 days 7 days 21 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum strength of the mortar used in load bearing brick masonry, is 200 N/cm2 150 N/cm2 50 N/cm2 100 N/cm2 200 N/cm2 150 N/cm2 50 N/cm2 100 N/cm2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The exterior angle between outer faces of a wall, is known as All listed here Quion Junction Turn All listed here Quion Junction Turn ANSWER DOWNLOAD EXAMIANS APP