Building Construction The voussoir placed at crown of an arch, is known as a Key Haunch Springer Soffit Key Haunch Springer Soffit ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to 40 mm 20 mm 30 mm 10 mm 40 mm 20 mm 30 mm 10 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple roof is used for spans 3.5 m or less 3.5 m but less than 5 m 5 m but less than 6.5 m 6.5 m but less than 8 m 3.5 m or less 3.5 m but less than 5 m 5 m but less than 6.5 m 6.5 m but less than 8 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of concrete bed of the foundation depends upon The projection of the concrete block beyond the footing over it All listed here The mix of the concrete The upward soil pressure The projection of the concrete block beyond the footing over it All listed here The mix of the concrete The upward soil pressure ANSWER DOWNLOAD EXAMIANS APP
Building Construction The entrained concrete is used in lining walls and roofs for making Heat insulated Neither (A) nor (B) Both (A) and (B) Sound insulated Heat insulated Neither (A) nor (B) Both (A) and (B) Sound insulated ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 15 to 20 cm 5 to 10 cm 30 to 45 cm 25 to 30 cm 15 to 20 cm 5 to 10 cm 30 to 45 cm 25 to 30 cm ANSWER DOWNLOAD EXAMIANS APP