Building Construction The voussoir placed at crown of an arch, is known as a Haunch Soffit Key Springer Haunch Soffit Key Springer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The disease of dry rot in timber is caused by Lack of ventilation Complete submergence in water Alternate wet and dry conditions None of these Lack of ventilation Complete submergence in water Alternate wet and dry conditions None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The inclined support at the ends of treads and rises of a stair, is known as Header String Baluster Beam Header String Baluster Beam ANSWER DOWNLOAD EXAMIANS APP
Building Construction The taper of precast concrete pile should not be more than 2 cm per metre length 1 cm per metre length 5 cm per metre length 4 cm per metre length 2 cm per metre length 1 cm per metre length 5 cm per metre length 4 cm per metre length ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for columns, is 50 to 100 mm 25 to 50 mm 75 to 125 mm 25 to 75 mm 50 to 100 mm 25 to 50 mm 75 to 125 mm 25 to 75 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Stability of an existing structure may be disturbed by All listed here Vibrations caused by traffic movements Rising of water table Mining in the neighborhood All listed here Vibrations caused by traffic movements Rising of water table Mining in the neighborhood ANSWER DOWNLOAD EXAMIANS APP