Building Construction

Building Construction
The form Work including the props can be removed from beams, only after

14 days
21 days
3 days
7 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In ordinary residential and public buildings, the damp proof course is generally provided at

Ground level
Water table level
Midway ground level and water-table level
Plinth level

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The important test to be conducted on a stone used in docks and harbors is

Toughness test
Hardness test
Weight test
Workability test

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For plastering the exposed brick walls, the cement sand mortar should be

1 : 4
1 : 6
1 : 3
1 : 2

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Bearing capacity of soils cannot be improved by

Driving sand piles
Draining sub-soil water
Watering surface of soil
Ramming crushed stone in soil

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The range of spread from the wall base to outer edge of a brick work foundation does not exceed

1 horizontal to 1 vertical
2 horizontals to 1 vertical
2/3 horizontal to 1 vertical
1/2 horizontal to 1 vertical

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑