Building Construction

Building Construction
The form Work including the props can be removed from beams, only after

14 days
3 days
21 days
7 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Rotary drilling is the fastest method in case of

All of these
Clay soils
Sandy soil
Rocky soils

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The Auger boring method is not suitable for

All of these
Very hard soil
Cemented soil
Vary soft soil

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed

10 m
15 m
20 m
5 m

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form work from the underside of slabs, can be removed only after

4 days
1 day
14 days
7 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The member which is placed horizontally to support common rafter of a sloping roof, is

Strut
Cleat
Batten
Purlin

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑