Building Construction The sill of a common wooden partition is Upper horizontal wooden member Vertical wooden member on either end Lower horizontal wooden member Intermediate horizontal wooden member Upper horizontal wooden member Vertical wooden member on either end Lower horizontal wooden member Intermediate horizontal wooden member ANSWER DOWNLOAD EXAMIANS APP
Building Construction The position of a brick when laid on its side 9 cm × 9 cm with its frog in the vertical plane, is called Brick on edge Brick on bed Brick held vertically Brick on end Brick on edge Brick on bed Brick held vertically Brick on end ANSWER DOWNLOAD EXAMIANS APP
Building Construction The strength of brick masonry in 1:6 cement mortar, is 60 tonnes/m2 20 tonnes/m2 40 tonnes/m2 50 tonnes/m2 60 tonnes/m2 20 tonnes/m2 40 tonnes/m2 50 tonnes/m2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of working a flat for the finishing coat, is known Blistering Dubbing out Knitting Floating Blistering Dubbing out Knitting Floating ANSWER DOWNLOAD EXAMIANS APP
Building Construction For effective drainage, the finished surface of flat roof should have a minimum slope of 1 to 50 1 in 5 1 in 10 1 in 20 1 to 50 1 in 5 1 in 10 1 in 20 ANSWER DOWNLOAD EXAMIANS APP