Building Construction The position of a brick when laid on its side 9 cm × 9 cm with its frog in the vertical plane, is called Brick on end Brick on bed Brick held vertically Brick on edge Brick on end Brick on bed Brick held vertically Brick on edge ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of an arch is the distance between Crown and springing line Ground level and springing line Intrados and extrados Crown and ground level Crown and springing line Ground level and springing line Intrados and extrados Crown and ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The portion of a brick cut across the width, is called Closer Half brick Bat Bed Closer Half brick Bat Bed ANSWER DOWNLOAD EXAMIANS APP
Building Construction The brick laid with its breadth parallel to the face of a wall, is known as Closer Header Stretcher None of these Closer Header Stretcher None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then None of these d = 0.557 a d = 0.775 a d = 0.445 a None of these d = 0.557 a d = 0.775 a d = 0.445 a ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling is the fastest method in case of Clay soils Rocky soils All of these Sandy soil Clay soils Rocky soils All of these Sandy soil ANSWER DOWNLOAD EXAMIANS APP