Building Construction A pre-stressed concrete pile is All of these Extremely durable Easy to handle Lighter in weight All of these Extremely durable Easy to handle Lighter in weight ANSWER DOWNLOAD EXAMIANS APP
Building Construction The skirting/dado in a bath roof should be upto Level of the tap 200 cm Ceiling 15 cm above floor level Level of the tap 200 cm Ceiling 15 cm above floor level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The differential settlement in case of foundations on sandy soils should not exceed 65 mm 40 mm 100 mm 25 mm 65 mm 40 mm 100 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct statement about silt soil from the following: The silt soil has particle size from 0.02 mm to 0.06 mm The least plastic type normally consists of more or less equidimensional grains of quartz In organic fine grained silt soil possesses no plasticity All listed here The silt soil has particle size from 0.02 mm to 0.06 mm The least plastic type normally consists of more or less equidimensional grains of quartz In organic fine grained silt soil possesses no plasticity All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction Sum of tread and rise must lie between 500 to 550 mm 600 to 650 mm 300 to 350 mm 400 to 450 mm 500 to 550 mm 600 to 650 mm 300 to 350 mm 400 to 450 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dutch bond is a modification of Single Flemish bond English bond Stretcher bond Header bond Single Flemish bond English bond Stretcher bond Header bond ANSWER DOWNLOAD EXAMIANS APP