Building Construction A pre-stressed concrete pile is Lighter in weight Extremely durable All of these Easy to handle Lighter in weight Extremely durable All of these Easy to handle ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Peeling Dubbing Blistering Hacking Peeling Dubbing Blistering Hacking ANSWER DOWNLOAD EXAMIANS APP
Building Construction The 19 cm × 9 cm side of a brick as seen in the wall face, is generally known as Header Stretcher Face Front Header Stretcher Face Front ANSWER DOWNLOAD EXAMIANS APP
Building Construction Stud(s) of a common wooden partition Are vertical wooden members Is the upper horizontal wooden member Are the intermediate horizontal wooden members Is the lower horizontal wooden member Are vertical wooden members Is the upper horizontal wooden member Are the intermediate horizontal wooden members Is the lower horizontal wooden member ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 mm 40 to 65 mm 25 to 40 mm 65 to 100 mm 25 mm 40 to 65 mm 25 to 40 mm 65 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 5 6 3 4 5 6 3 4 ANSWER DOWNLOAD EXAMIANS APP