Building Construction A pre-stressed concrete pile is Extremely durable All of these Lighter in weight Easy to handle Extremely durable All of these Lighter in weight Easy to handle ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling is the fastest method in case of Rocky soils Sandy soil All of these Clay soils Rocky soils Sandy soil All of these Clay soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for foundations, is 30 to 125 mm 75 to 125 mm 25 to 50 mm 50 to 100 mm 30 to 125 mm 75 to 125 mm 25 to 50 mm 50 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.5 du 1.75 du 1.35 du 1.25 du 1.5 du 1.75 du 1.35 du 1.25 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the construction of arches, sand box method is used for Actual laying of arch work Centring Striking of centring None of these Actual laying of arch work Centring Striking of centring None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The position of a brick when laid on its side 9 cm × 9 cm with its frog in the vertical plane, is called Brick on edge Brick on bed Brick held vertically Brick on end Brick on edge Brick on bed Brick held vertically Brick on end ANSWER DOWNLOAD EXAMIANS APP