Building Construction A pre-stressed concrete pile is Easy to handle Lighter in weight All of these Extremely durable Easy to handle Lighter in weight All of these Extremely durable ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Upto roof above ground level Between ceiling and ground level Upto ceiling from the ground level Between ceiling and floor level Upto roof above ground level Between ceiling and ground level Upto ceiling from the ground level Between ceiling and floor level ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 1, 2, 3, 4, 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling is the fastest method in case of Sandy soil All of these Clay soils Rocky soils Sandy soil All of these Clay soils Rocky soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction The triangular space formed between the extrados and the horizontal line drawn through the crown of an arch is known as Skewbacks Voussoirs Haunch Spandril Skewbacks Voussoirs Haunch Spandril ANSWER DOWNLOAD EXAMIANS APP
Building Construction In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used Pressure pile Franki pile Vibro pile Pedestal pile Pressure pile Franki pile Vibro pile Pedestal pile ANSWER DOWNLOAD EXAMIANS APP