Building Construction A pre-stressed concrete pile is Lighter in weight All of these Extremely durable Easy to handle Lighter in weight All of these Extremely durable Easy to handle ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Hacking Dubbing Peeling Blistering Hacking Dubbing Peeling Blistering ANSWER DOWNLOAD EXAMIANS APP
Building Construction The triangular portion between any two adjacent arches and the tangent to their crowns, is Haunch Soffit Rise Spandril Haunch Soffit Rise Spandril ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following piles has a cast iron shoe even after removal of the hollow cylindrical steel casing? Simplex pile Both (A) and (C) of the above Pedestal pile Vibro pile Simplex pile Both (A) and (C) of the above Pedestal pile Vibro pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The loose pockets in soil mass can be bridged safely by providing a raft foundation provided the soft area is smaller than Three-fourth the column spacing The column spacing Half the column spacing One-third the column spacing Three-fourth the column spacing The column spacing Half the column spacing One-third the column spacing ANSWER DOWNLOAD EXAMIANS APP
Building Construction Raft foundations are used for: Providing increased area of foundation over poor bearing capacity of soil All listed here Counter acting the hydrostatic effect Spanning over small soft or loose pockets Providing increased area of foundation over poor bearing capacity of soil All listed here Counter acting the hydrostatic effect Spanning over small soft or loose pockets ANSWER DOWNLOAD EXAMIANS APP