Building Construction A pre-stressed concrete pile is Easy to handle Lighter in weight All of these Extremely durable Easy to handle Lighter in weight All of these Extremely durable ANSWER DOWNLOAD EXAMIANS APP
Building Construction The skirting/dado in a bath roof should be upto 15 cm above floor level Ceiling Level of the tap 200 cm 15 cm above floor level Ceiling Level of the tap 200 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The black cotton soil Undergoes volumetric changes Swells excessively when wet All of these Shrinks excessively when dry Undergoes volumetric changes Swells excessively when wet All of these Shrinks excessively when dry ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical member running through middle of a shutter frame, is Mullion Post Reveal Style Mullion Post Reveal Style ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of multi-storeyed buildings, the forms to be removed first are All the above at the same time Bottom of beams and girders Sides of beams and girders Column forms All the above at the same time Bottom of beams and girders Sides of beams and girders Column forms ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical sides of a door and window openings provided in a wall, are known as Verticals Reveals Jambs None of these Verticals Reveals Jambs None of these ANSWER DOWNLOAD EXAMIANS APP