Building Construction Ornamental moulded course placed on the top of a wall, is Lintel Coping Frieze Cornice Lintel Coping Frieze Cornice ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 7 days 14 days 1 day 4 days 7 days 14 days 1 day 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundation which consists of a thick reinforced cement slab covering whole area to support heavy concentrated structural loads, is known as Strap footing None of these Raft footing Combined footing Strap footing None of these Raft footing Combined footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction Bearing capacity of soils cannot be improved by Watering surface of soil Ramming crushed stone in soil Draining sub-soil water Driving sand piles Watering surface of soil Ramming crushed stone in soil Draining sub-soil water Driving sand piles ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stepped structure provided for lateral support of a structure, is Breast wall Buttress Parapet wall Retaining wall Breast wall Buttress Parapet wall Retaining wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct statements from the following: Cracks appear on the plastered surface in the form of hair cracks In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Excessive thermal variations in the backing or plaster causes the plaster to fall All listed here Cracks appear on the plastered surface in the form of hair cracks In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Excessive thermal variations in the backing or plaster causes the plaster to fall All listed here ANSWER DOWNLOAD EXAMIANS APP