Building Construction Ornamental moulded course placed on the top of a wall, is Lintel Coping Frieze Cornice Lintel Coping Frieze Cornice ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with the 4 to 6 mm marble chips, is known Chip floor Terrazzo floor Marble floor Reinforced marble floor Chip floor Terrazzo floor Marble floor Reinforced marble floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The steel pile which is generally sunk in soft clay or loose sand of low bearing capacity, is Screw pile H-pile Pipe pile Disc pile Screw pile H-pile Pipe pile Disc pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth or height of the arch is the None of these Perpendicular distance between intrados and extrados Perpendicular distance between springing line and extrados Vertical distance between springing line and intrados None of these Perpendicular distance between intrados and extrados Perpendicular distance between springing line and extrados Vertical distance between springing line and intrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel ANSWER DOWNLOAD EXAMIANS APP
Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 90° 30° 0° 60° 90° 30° 0° 60° ANSWER DOWNLOAD EXAMIANS APP