Building Construction If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then d = 0.445 a None of these d = 0.775 a d = 0.557 a d = 0.445 a None of these d = 0.775 a d = 0.557 a ANSWER DOWNLOAD EXAMIANS APP
Building Construction The skirting/dado in a bath roof should be upto Level of the tap 15 cm above floor level 200 cm Ceiling Level of the tap 15 cm above floor level 200 cm Ceiling ANSWER DOWNLOAD EXAMIANS APP
Building Construction The projections of head or sill of a door or window frame are Chocks Horns Transoms Stops Chocks Horns Transoms Stops ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of working a flat for the finishing coat, is known Blistering Knitting Dubbing out Floating Blistering Knitting Dubbing out Floating ANSWER DOWNLOAD EXAMIANS APP
Building Construction The art of bringing the floor to a true level surface by means of screeds, is called None of these Bedding Screeding Topping None of these Bedding Screeding Topping ANSWER DOWNLOAD EXAMIANS APP
Building Construction The under surface of an arch, is called Haunch Soffit Back Intrados Haunch Soffit Back Intrados ANSWER DOWNLOAD EXAMIANS APP