Building Construction If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then d = 0.445 a d = 0.775 a d = 0.557 a None of these d = 0.445 a d = 0.775 a d = 0.557 a None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The art of bringing the floor to a true level surface by means of screeds, is called Bedding None of these Topping Screeding Bedding None of these Topping Screeding ANSWER DOWNLOAD EXAMIANS APP
Building Construction For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than 1/2h 2 h h/4 h 1/2h 2 h h/4 h ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to 10 mm 30 mm 20 mm 40 mm 10 mm 30 mm 20 mm 40 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Chips floor Terrazzo floor Mosaic floor Marble floor Chips floor Terrazzo floor Mosaic floor Marble floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The taper of precast concrete pile should not be more than 4 cm per metre length 5 cm per metre length 1 cm per metre length 2 cm per metre length 4 cm per metre length 5 cm per metre length 1 cm per metre length 2 cm per metre length ANSWER DOWNLOAD EXAMIANS APP