If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then

d = 0.445 a
d = 0.775 a
d = 0.557 a
None of these

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The art of bringing the floor to a true level surface by means of screeds, is called

Bedding
None of these
Topping
Screeding

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than

1/2h
2 h
h/4
h

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to

10 mm
30 mm
20 mm
40 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
A floor constructed with 3 mm marble chips, is known

Chips floor
Terrazzo floor
Mosaic floor
Marble floor

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The taper of precast concrete pile should not be more than

4 cm per metre length
5 cm per metre length
1 cm per metre length
2 cm per metre length

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑