Building Construction If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then d = 0.557 a d = 0.445 a d = 0.775 a None of these d = 0.557 a d = 0.445 a d = 0.775 a None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Minimum width of landing should be One fourth the width of stairs Equal to width of stairs Twice the width of stairs Half the width of stairs One fourth the width of stairs Equal to width of stairs Twice the width of stairs Half the width of stairs ANSWER DOWNLOAD EXAMIANS APP
Building Construction The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed 10 m 5 m 20 m 15 m 10 m 5 m 20 m 15 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil, may be improved by Drainage Grouting Compaction Chemical action Drainage Grouting Compaction Chemical action ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as Queen closer Bevelled closer King closer Half king closer Queen closer Bevelled closer King closer Half king closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The term string is used for A vertical member between two treads The underside of a stair A sloping member which supports the steps in a stair Outer projecting edge of a tread A vertical member between two treads The underside of a stair A sloping member which supports the steps in a stair Outer projecting edge of a tread ANSWER DOWNLOAD EXAMIANS APP