Building Construction
Rotary drilling

Is not economical for holes of less than 10 cm
Hinders the ground water observations and permeability test
Is not suitable for deposits containing very coarse gravel
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Depth or height of the arch is the

Vertical distance between springing line and intrados
Perpendicular distance between intrados and extrados
None of these
Perpendicular distance between springing line and extrados

ANSWER DOWNLOAD EXAMIANS APP