If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then

d = 0.557 a
d = 0.775 a
None of these
d = 0.445 a

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
While designing a stair, the product of rise and going is approximately kept equal to

500
350
450
420

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The depth of an arch is the distance between

Intrados and extrados
Crown and ground level
Ground level and springing line
Crown and springing line

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The depth of concrete bed of the foundation depends upon

The projection of the concrete block beyond the footing over it
All listed here
The upward soil pressure
The mix of the concrete

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as

Bat
Stretcher
Closer
Header

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Under reamed piles are generally used for

Machine foundations
Factory building
All listed here
Tall structures

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑