Building Construction If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then d = 0.557 a d = 0.775 a None of these d = 0.445 a d = 0.557 a d = 0.775 a None of these d = 0.445 a ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of excavation of foundations, is generally measured with a Steel tape Ranging rod Boning rod Levelling staff Steel tape Ranging rod Boning rod Levelling staff ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of bond in which every course contains both headers and stretchers, is called Mixed bond Russian bond English bond Flemish bond Mixed bond Russian bond English bond Flemish bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundation is generally provided if soil is Made up All listed here Compressible Water logged Made up All listed here Compressible Water logged ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Terrazzo floor Mosaic floor Chips floor Marble floor Terrazzo floor Mosaic floor Chips floor Marble floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple roof is used for spans 3.5 m but less than 5 m 3.5 m or less 5 m but less than 6.5 m 6.5 m but less than 8 m 3.5 m but less than 5 m 3.5 m or less 5 m but less than 6.5 m 6.5 m but less than 8 m ANSWER DOWNLOAD EXAMIANS APP