Building Construction The ceiling height of a building is Upto ceiling from the ground level Between ceiling and floor level Upto roof above ground level Between ceiling and ground level Upto ceiling from the ground level Between ceiling and floor level Upto roof above ground level Between ceiling and ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of joint commonly used at the junction of a principal rafter and tie beam in timber trusses is Mortise and tenon joint Mitred joint Oblique mortise and tenon joint Butt joint Mortise and tenon joint Mitred joint Oblique mortise and tenon joint Butt joint ANSWER DOWNLOAD EXAMIANS APP
Building Construction A cut in frame of a door to receive the shutter, is called Rebate Louver Stop Horn Rebate Louver Stop Horn ANSWER DOWNLOAD EXAMIANS APP
Building Construction The under surface of an arch, is called Back Intrados Soffit Haunch Back Intrados Soffit Haunch ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept Less than its projection beyond wall base 15 cm Equal to its projection beyond wall base 10 cm Less than its projection beyond wall base 15 cm Equal to its projection beyond wall base 10 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Brick nogging type of partition wall, is constructed by Laying bricks as stretchers in cement mortar Constructing brick work within a wooden framework Reinforcing brick wall with iron straps Laying bricks as headers in cement mortar Laying bricks as stretchers in cement mortar Constructing brick work within a wooden framework Reinforcing brick wall with iron straps Laying bricks as headers in cement mortar ANSWER DOWNLOAD EXAMIANS APP