Building Construction The ceiling height of a building is Upto ceiling from the ground level Between ceiling and ground level Between ceiling and floor level Upto roof above ground level Upto ceiling from the ground level Between ceiling and ground level Between ceiling and floor level Upto roof above ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 18 24 12 25 18 24 12 25 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/6th of the span 1/8th of the span 1/10th of the span 1/12th of the span 1/6th of the span 1/8th of the span 1/10th of the span 1/12th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of footing which is used to transmit heavy loads through steel columns is Raft foundation Isolated footing Well foundation Grillage foundation Raft foundation Isolated footing Well foundation Grillage foundation ANSWER DOWNLOAD EXAMIANS APP
Building Construction In verandah (corridor) floors outward slope is 1 in 70 1 in 60 1 in 40 1 in 50 1 in 70 1 in 60 1 in 40 1 in 50 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pitched and sloping roofs are suitable for Coastal regions Covering large areas Plain regions All of these Coastal regions Covering large areas Plain regions All of these ANSWER DOWNLOAD EXAMIANS APP