Building Construction The ceiling height of a building is Between ceiling and ground level Upto roof above ground level Between ceiling and floor level Upto ceiling from the ground level Between ceiling and ground level Upto roof above ground level Between ceiling and floor level Upto ceiling from the ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The portion of a brick cut across the width, is called Bat Half brick Closer Bed Bat Half brick Closer Bed ANSWER DOWNLOAD EXAMIANS APP
Building Construction The projections of head or sill of a door or window frame are Stops Transoms Chocks Horns Stops Transoms Chocks Horns ANSWER DOWNLOAD EXAMIANS APP
Building Construction According to Rankine's formula, minimum depth of foundations, is (P/2w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)] (P/2w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)] ANSWER DOWNLOAD EXAMIANS APP
Building Construction In verandah (corridor) floors outward slope is 1 in 60 1 in 70 1 in 50 1 in 40 1 in 60 1 in 70 1 in 50 1 in 40 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Single Flemish bond consists of English bond facing and double Flemish bond backing in each course Double Flemish bond facing and English bond backing in each course Stretcher bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course English bond facing and double Flemish bond backing in each course Double Flemish bond facing and English bond backing in each course Stretcher bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course ANSWER DOWNLOAD EXAMIANS APP