Building Construction
The ceiling height of a building is

Upto roof above ground level
Upto ceiling from the ground level
Between ceiling and ground level
Between ceiling and floor level

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Auger boring

Is the most primitive method for making a hole in the ground
Is generally employed in cohesive and other self soils above water table
Is most economical up-to a depth of 5 meters
All of these

ANSWER DOWNLOAD EXAMIANS APP