Building Construction The ceiling height of a building is Between ceiling and floor level Between ceiling and ground level Upto ceiling from the ground level Upto roof above ground level Between ceiling and floor level Between ceiling and ground level Upto ceiling from the ground level Upto roof above ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 40 to 65 mm 65 to 100 mm 25 mm 25 to 40 mm 40 to 65 mm 65 to 100 mm 25 mm 25 to 40 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The number of steps in a flight generally should not be less than 2 5 No limit 3 2 5 No limit 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided on a sloping roof of a building, is called Louvered window Lantern window Dormer window Rash window Louvered window Lantern window Dormer window Rash window ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundations are suitable for Compact soils Soft rocks Multi-storeyed buildings Water logged soils Compact soils Soft rocks Multi-storeyed buildings Water logged soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction The additional piles which are driven to increase the capacity of supporting loads on vertical piles, are known Sinking piles Eccentric piles Raking piles Construction piles Sinking piles Eccentric piles Raking piles Construction piles ANSWER DOWNLOAD EXAMIANS APP