Building Construction The ceiling height of a building is Between ceiling and floor level Between ceiling and ground level Upto ceiling from the ground level Upto roof above ground level Between ceiling and floor level Between ceiling and ground level Upto ceiling from the ground level Upto roof above ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time ANSWER DOWNLOAD EXAMIANS APP
Building Construction The triangular portion between any two adjacent arches and the tangent to their crowns, is Soffit Haunch Spandril Rise Soffit Haunch Spandril Rise ANSWER DOWNLOAD EXAMIANS APP
Building Construction In flat roof of reinforced cement concrete, the recommended angle of slope, is Zero 200° 10° A few degrees Zero 200° 10° A few degrees ANSWER DOWNLOAD EXAMIANS APP
Building Construction A solid core of rock is formed inside the cylinder in the case of Auger boring Percussion drilling Wash boring Diamond drilling Auger boring Percussion drilling Wash boring Diamond drilling ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pitched and sloping roofs are suitable for Covering large areas Plain regions All of these Coastal regions Covering large areas Plain regions All of these Coastal regions ANSWER DOWNLOAD EXAMIANS APP