Building Construction
The ceiling height of a building is

Between ceiling and floor level
Between ceiling and ground level
Upto ceiling from the ground level
Upto roof above ground level

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Which one of the following activities is not correct as applicable to brick corbels

The maximum projection of the corbel should not be more than the thickness of the wall
Stretcher bond is generally used for the construction of brick corbel
The discontinuous corbels are used to carry heavy concentrated loads
The maximum projection of each corbel course should be limited to a quarter brick at a time

ANSWER DOWNLOAD EXAMIANS APP