Building Construction The ceiling height of a building is Upto roof above ground level Upto ceiling from the ground level Between ceiling and ground level Between ceiling and floor level Upto roof above ground level Upto ceiling from the ground level Between ceiling and ground level Between ceiling and floor level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 7 days 1 day 4 days 14 days 7 days 1 day 4 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Extrados Spandril Intrados Rise Extrados Spandril Intrados Rise ANSWER DOWNLOAD EXAMIANS APP
Building Construction To construct a 10 cm thick partition wall, you will prefer English bond Stretcher bond Flemish bond Header bond English bond Stretcher bond Flemish bond Header bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 3, 2, 5, 1, 4 5, 4, 3, 2, 1 2, 1, 3, 5, 4 1, 2, 3, 4, 5 3, 2, 5, 1, 4 5, 4, 3, 2, 1 2, 1, 3, 5, 4 1, 2, 3, 4, 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept Less than its projection beyond wall base 10 cm 15 cm Equal to its projection beyond wall base Less than its projection beyond wall base 10 cm 15 cm Equal to its projection beyond wall base ANSWER DOWNLOAD EXAMIANS APP