Building Construction The number of steps in a flight generally should not be less than 2 3 No limit 5 2 3 No limit 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction A temporary rigid structure having platforms to enable masons to work at different stages of a building, is known as Under pinning Raking shore Dead shore Scaffolding Under pinning Raking shore Dead shore Scaffolding ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 to 40 mm 25 mm 40 to 65 mm 65 to 100 mm 25 to 40 mm 25 mm 40 to 65 mm 65 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile which supports the load partly by friction and partly by resting on hard stratum, is called Rough pile Friction pile Bearing pile Friction bearing pile Rough pile Friction pile Bearing pile Friction bearing pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Safe bearing capacity of black cotton soil varies from 2 to 3 t/m² 5 to 7.5 t/m² 10 to 12 t/m² 8 to 10 t/m² 2 to 3 t/m² 5 to 7.5 t/m² 10 to 12 t/m² 8 to 10 t/m² ANSWER DOWNLOAD EXAMIANS APP
Building Construction Arches in the form of masonry arcs struck from more than four centres, are called Gothic arches Drop gothic arches Two curved arches Ogee arches Gothic arches Drop gothic arches Two curved arches Ogee arches ANSWER DOWNLOAD EXAMIANS APP