Building Construction The number of steps in a flight generally should not be less than 5 No limit 2 3 5 No limit 2 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 3, 2, 5, 1, 4 2, 1, 3, 5, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 3, 2, 5, 1, 4 2, 1, 3, 5, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct specification of one-room quarters generally adopted from the following: Six quarters in a row All listed here The size of room is either 3.5 m × 3 m or 4.2 m × 2.5 m The front verandah is kept 2 m wide Six quarters in a row All listed here The size of room is either 3.5 m × 3 m or 4.2 m × 2.5 m The front verandah is kept 2 m wide ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to 20 mm 10 mm 30 mm 40 mm 20 mm 10 mm 30 mm 40 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 21 days 14 days 3 days 7 days 21 days 14 days 3 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction A roof which slopes in four directions, is called Gambrel roof Shed roof Gable end roof Hipped roof Gambrel roof Shed roof Gable end roof Hipped roof ANSWER DOWNLOAD EXAMIANS APP