Building Construction The number of steps in a flight generally should not be less than 3 2 No limit 5 3 2 No limit 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In ordinary residential and public buildings, the damp proof course is generally provided at Midway ground level and water-table level Ground level Plinth level Water table level Midway ground level and water-table level Ground level Plinth level Water table level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 15 to 20 cm 5 to 10 cm 30 to 45 cm 25 to 30 cm 15 to 20 cm 5 to 10 cm 30 to 45 cm 25 to 30 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction A temporary rigid structure having platforms to enable masons to work at different stages of a building, is known as Raking shore Scaffolding Dead shore Under pinning Raking shore Scaffolding Dead shore Under pinning ANSWER DOWNLOAD EXAMIANS APP
Building Construction The inclined support at the ends of treads and rises of a stair, is known as Baluster Header String Beam Baluster Header String Beam ANSWER DOWNLOAD EXAMIANS APP
Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 6 3 4 5 6 3 4 5 ANSWER DOWNLOAD EXAMIANS APP