Building Construction
Auger boring

Is most economical up-to a depth of 5 meters
Is the most primitive method for making a hole in the ground
Is generally employed in cohesive and other self soils above water table
All of these

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In the method of tube boring of soil investigation, the following is essential:

The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand
All listed here
A flap valve at the bottom of tube is provided to extract the soil sample
A tube of about 2 meters length and 20 cm diameter with a cutting edge

ANSWER DOWNLOAD EXAMIANS APP