Building Construction In jack arch floor, the rise is kept 1/12th of the span 1/6th of the span 1/8th of the span 1/10th of the span 1/12th of the span 1/6th of the span 1/8th of the span 1/10th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction For each storey (or, story) of a building, the depth of exploration should be 1 meter 2 meters 3 meters 4 meters 1 meter 2 meters 3 meters 4 meters ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dado is usually provided in Verandah (belcony) Bath rooms Living rooms Dining halls Verandah (belcony) Bath rooms Living rooms Dining halls ANSWER DOWNLOAD EXAMIANS APP
Building Construction A projecting piece usually provided to support a truss, is Coping Lintel Frieze Cornice Coping Lintel Frieze Cornice ANSWER DOWNLOAD EXAMIANS APP
Building Construction The angular steps used for changing direction of the stairs, are called Radial steps Winders Round steps Angular steps Radial steps Winders Round steps Angular steps ANSWER DOWNLOAD EXAMIANS APP
Building Construction In grillage foundations, distance between flanges of grillage beams, is kept 40 cm Maximum of (A), (B) and (C) Equal to flange width Twice the flange width 40 cm Maximum of (A), (B) and (C) Equal to flange width Twice the flange width ANSWER DOWNLOAD EXAMIANS APP