Building Construction In jack arch floor, the rise is kept 1/8th of the span 1/10th of the span 1/6th of the span 1/12th of the span 1/8th of the span 1/10th of the span 1/6th of the span 1/12th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction Bearing capacity of soils cannot be improved by Ramming crushed stone in soil Watering surface of soil Draining sub-soil water Driving sand piles Ramming crushed stone in soil Watering surface of soil Draining sub-soil water Driving sand piles ANSWER DOWNLOAD EXAMIANS APP
Building Construction In verandah (corridor) floors outward slope is 1 in 50 1 in 40 1 in 60 1 in 70 1 in 50 1 in 40 1 in 60 1 in 70 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Pressure pile Franki pile Simplex pile Vibro pile Pressure pile Franki pile Simplex pile Vibro pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept 15 cm Less than its projection beyond wall base 10 cm Equal to its projection beyond wall base 15 cm Less than its projection beyond wall base 10 cm Equal to its projection beyond wall base ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 21 days 3 days 7 days 14 days 21 days 3 days 7 days 14 days ANSWER DOWNLOAD EXAMIANS APP