Building Construction The size of a floor tile commonly used, is 20 cm × 20 cm × 2 cm 22.5 × 22.5 cm × 2.2 cm 15 cm × 15 cm × 1.8 cm All listed here 20 cm × 20 cm × 2 cm 22.5 × 22.5 cm × 2.2 cm 15 cm × 15 cm × 1.8 cm All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction Mansard roof is a roof which slopes in Two directions with break in the slope on each side Four directions with break in the slope on each side Two directions without break in the slope on each side Four directions without break in the slope on each side Two directions with break in the slope on each side Four directions with break in the slope on each side Two directions without break in the slope on each side Four directions without break in the slope on each side ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided in flat roof of a room, is known Dormer window Louvered window Sky window Lantern window Dormer window Louvered window Sky window Lantern window ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of the surfaces of a sloping roof forming an external angle exceeding 180°, is Ridge None of these Hip Valley Ridge None of these Hip Valley ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following factors is considered for the orientation of buildings? The direction of the prevailing winds in the area The extent up to which the sunrays penetrate with the verandah All listed here The exposure of the walls and roof of the buildings to the rays of sun The direction of the prevailing winds in the area The extent up to which the sunrays penetrate with the verandah All listed here The exposure of the walls and roof of the buildings to the rays of sun ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 1, 2, 3, 4, 5 3, 2, 5, 1, 4 5, 4, 3, 2, 1 2, 1, 3, 5, 4 1, 2, 3, 4, 5 3, 2, 5, 1, 4 5, 4, 3, 2, 1 2, 1, 3, 5, 4 ANSWER DOWNLOAD EXAMIANS APP