Building Construction Negative skin friction Both (A) and (B) Neither (A) not (B) Develops due to lowering of ground water Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile Both (A) and (B) Neither (A) not (B) Develops due to lowering of ground water Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction If (φ) is the angle of repose of soil of weight w kg/m3, the horizontal pressure p at a depth of h meters per metre length of wall, is wh × √[(1 - sin φ)/(1 + sin φ)] wh × √[(1 + sin φ)/(1 - sin φ)] wh × [(1 - sin φ)/(1 + sin φ)] (wh/2) × [(1 - sin φ)/(1 + sin φ)] wh × √[(1 - sin φ)/(1 + sin φ)] wh × √[(1 + sin φ)/(1 - sin φ)] wh × [(1 - sin φ)/(1 + sin φ)] (wh/2) × [(1 - sin φ)/(1 + sin φ)] ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: The length of the foundation slab = 7.00 m Area of footing slab = 11.00 m2 Distance of C.G. of the loads from the smaller column = 3.00 m All listed here The length of the foundation slab = 7.00 m Area of footing slab = 11.00 m2 Distance of C.G. of the loads from the smaller column = 3.00 m All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of arch used for high class buildings where appearance is of prime importance, is known as Axed brick arch Gauged brick arch Ashlar arch Rubble arch Axed brick arch Gauged brick arch Ashlar arch Rubble arch ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 18 12 25 24 18 12 25 24 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 7 days 14 days 4 days 1 day 7 days 14 days 4 days 1 day ANSWER DOWNLOAD EXAMIANS APP