Building Construction The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to 20 mm 10 mm 40 mm 30 mm 20 mm 10 mm 40 mm 30 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Grillage foundation Is light and economical Is used to transfer heavy structural loads from steel columns to a soil having low bearing capacity Does not require deep cutting as the required base area with required pressure intensity is obtained at a shallow depth All listed here Is light and economical Is used to transfer heavy structural loads from steel columns to a soil having low bearing capacity Does not require deep cutting as the required base area with required pressure intensity is obtained at a shallow depth All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 21 days 3 days 7 days 14 days 21 days 3 days 7 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 4 days 14 days 1 day 7 days 4 days 14 days 1 day 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following piles has a cast iron shoe even after removal of the hollow cylindrical steel casing? Both (A) and (C) of the above Pedestal pile Simplex pile Vibro pile Both (A) and (C) of the above Pedestal pile Simplex pile Vibro pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 to 40 mm 25 mm 65 to 100 mm 40 to 65 mm 25 to 40 mm 25 mm 65 to 100 mm 40 to 65 mm ANSWER DOWNLOAD EXAMIANS APP