Building Construction Suitable spacing of timber piles, is 90 cm 70 cm 100 cm 80 cm 90 cm 70 cm 100 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction In soils possessing low bearing capacity, the type of foundation generally provided, is All of these Column footing Raft footing Grillage footing All of these Column footing Raft footing Grillage footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction A pre-stressed concrete pile is Easy to handle Lighter in weight Extremely durable All of these Easy to handle Lighter in weight Extremely durable All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction To support a heavy structure in sandy soil, the type of foundation generally used, is Pier footing Raft footing Strap footing Combined footing Pier footing Raft footing Strap footing Combined footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction Crown is located at Skew-back of the arch None of these Highest point on the extrados of the arch Highest point on the intrados of the arch Skew-back of the arch None of these Highest point on the extrados of the arch Highest point on the intrados of the arch ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 14 days 4 days 1 day 7 days 14 days 4 days 1 day 7 days ANSWER DOWNLOAD EXAMIANS APP