Building Construction Suitable spacing of timber piles, is 100 cm 70 cm 80 cm 90 cm 100 cm 70 cm 80 cm 90 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil, may be improved by Compaction Drainage Chemical action Grouting Compaction Drainage Chemical action Grouting ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The maximum projection of the corbel should not be more than the thickness of the wall The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundation is generally provided if soil is All listed here Made up Compressible Water logged All listed here Made up Compressible Water logged ANSWER DOWNLOAD EXAMIANS APP
Building Construction Gravels Vary in size between 2 to 20 mm Never swell when they come into contact with water All listed here Are cohesionless aggregates Vary in size between 2 to 20 mm Never swell when they come into contact with water All listed here Are cohesionless aggregates ANSWER DOWNLOAD EXAMIANS APP
Building Construction The alignment of a cross joint along the plumb line is Perpend Lintel Bed block Vertical line Perpend Lintel Bed block Vertical line ANSWER DOWNLOAD EXAMIANS APP