Building Construction Brick nogging type of partition wall, is constructed by Reinforcing brick wall with iron straps Laying bricks as headers in cement mortar Constructing brick work within a wooden framework Laying bricks as stretchers in cement mortar Reinforcing brick wall with iron straps Laying bricks as headers in cement mortar Constructing brick work within a wooden framework Laying bricks as stretchers in cement mortar ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the construction of arches, sand box method is used for Centring Actual laying of arch work None of these Striking of centring Centring Actual laying of arch work None of these Striking of centring ANSWER DOWNLOAD EXAMIANS APP
Building Construction The opening provided in sloping roof with its top parallel to the roof surface, is called Dormer window Louvered window Sky light window Lantern window Dormer window Louvered window Sky light window Lantern window ANSWER DOWNLOAD EXAMIANS APP
Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A base course is prepared as in cement concrete flooring A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A base course is prepared as in cement concrete flooring ANSWER DOWNLOAD EXAMIANS APP
Building Construction A temporary rigid structure having platforms to enable masons to work at different stages of a building, is known as Dead shore Scaffolding Under pinning Raking shore Dead shore Scaffolding Under pinning Raking shore ANSWER DOWNLOAD EXAMIANS APP
Building Construction Engineering news formula for obtaining safe bearing capacity of pile for drop hammer, is, Q = Wh/6 (S + 2.5) Q = Wh/2.5 (S + 6) Q = (W × 6)/h (S + 2.5) Q = (W × 2.5)/6 (S + h) Q = Wh/6 (S + 2.5) Q = Wh/2.5 (S + 6) Q = (W × 6)/h (S + 2.5) Q = (W × 2.5)/6 (S + h) ANSWER DOWNLOAD EXAMIANS APP