Building Construction The arrangement of supporting an existing structure by providing supports underneath, is known as Jacking Underpinning Shoring Piling Jacking Underpinning Shoring Piling ANSWER DOWNLOAD EXAMIANS APP
Building Construction The highest line of sloping roof, where two opposite slopes meet, is known as Crown Ridge Eave Rafter Crown Ridge Eave Rafter ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A flap valve at the bottom of tube is provided to extract the soil sample A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A flap valve at the bottom of tube is provided to extract the soil sample A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept Less than its projection beyond wall base Equal to its projection beyond wall base 15 cm 10 cm Less than its projection beyond wall base Equal to its projection beyond wall base 15 cm 10 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stepped structure provided for lateral support of a structure, is Breast wall Retaining wall Parapet wall Buttress Breast wall Retaining wall Parapet wall Buttress ANSWER DOWNLOAD EXAMIANS APP
Building Construction If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then d = 0.775 a None of these d = 0.445 a d = 0.557 a d = 0.775 a None of these d = 0.445 a d = 0.557 a ANSWER DOWNLOAD EXAMIANS APP