Building Construction The arrangement of supporting an existing structure by providing supports underneath, is known as Underpinning Shoring Piling Jacking Underpinning Shoring Piling Jacking ANSWER DOWNLOAD EXAMIANS APP
Building Construction Minimum width of landing should be One fourth the width of stairs Half the width of stairs Twice the width of stairs Equal to width of stairs One fourth the width of stairs Half the width of stairs Twice the width of stairs Equal to width of stairs ANSWER DOWNLOAD EXAMIANS APP
Building Construction A temporary rigid structure having platforms to enable masons to work at different stages of a building, is known as Under pinning Raking shore Dead shore Scaffolding Under pinning Raking shore Dead shore Scaffolding ANSWER DOWNLOAD EXAMIANS APP
Building Construction The loose pockets in soil mass can be bridged safely by providing a raft foundation provided the soft area is smaller than Three-fourth the column spacing The column spacing One-third the column spacing Half the column spacing Three-fourth the column spacing The column spacing One-third the column spacing Half the column spacing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of an arch is the distance between Intrados and extrados Ground level and springing line Crown and ground level Crown and springing line Intrados and extrados Ground level and springing line Crown and ground level Crown and springing line ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads ANSWER DOWNLOAD EXAMIANS APP