Building Construction The arrangement of supporting an existing structure by providing supports underneath, is known as Jacking Shoring Piling Underpinning Jacking Shoring Piling Underpinning ANSWER DOWNLOAD EXAMIANS APP
Building Construction In verandah (corridor) floors outward slope is 1 in 60 1 in 40 1 in 50 1 in 70 1 in 60 1 in 40 1 in 50 1 in 70 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: A flap valve at the bottom of tube is provided to extract the soil sample All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge A flap valve at the bottom of tube is provided to extract the soil sample All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge ANSWER DOWNLOAD EXAMIANS APP
Building Construction The black cotton soil Swells excessively when wet Shrinks excessively when dry Undergoes volumetric changes All of these Swells excessively when wet Shrinks excessively when dry Undergoes volumetric changes All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction A roof which slopes in four directions, is called Gambrel roof Gable end roof Hipped roof Shed roof Gambrel roof Gable end roof Hipped roof Shed roof ANSWER DOWNLOAD EXAMIANS APP
Building Construction The number of steps in a flight generally should not be less than 3 5 2 No limit 3 5 2 No limit ANSWER DOWNLOAD EXAMIANS APP