Building Construction In grillage foundations a minimum 15 cm cover is provided on Upper flange of top tier Ends of external beams Lower beam of lower tier None to these Upper flange of top tier Ends of external beams Lower beam of lower tier None to these ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 24 18 25 12 24 18 25 12 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In clay soil Consolidation continues even after several years of construction All listed here Differential settlement is generally prevalent Swelling and shrinkage characteristics prevail Consolidation continues even after several years of construction All listed here Differential settlement is generally prevalent Swelling and shrinkage characteristics prevail ANSWER DOWNLOAD EXAMIANS APP
Building Construction According to National Building Code, the hydrants in water mains is provided at minimum interval of 60 m 75 m 90 m 50 m 60 m 75 m 90 m 50 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 45 mm 25 mm 15 mm 35 mm 45 mm 25 mm 15 mm 35 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 14 days 4 days 1 day 7 days 14 days 4 days 1 day 7 days ANSWER DOWNLOAD EXAMIANS APP