Building Construction
The bearing capacity of a water logged soil can be improved by

Increasing the depth of foundation
Grouting
Compacting the soil
Draining the soil

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Which one of the following activities is not correct as applicable to brick corbels

The maximum projection of each corbel course should be limited to a quarter brick at a time
The discontinuous corbels are used to carry heavy concentrated loads
Stretcher bond is generally used for the construction of brick corbel
The maximum projection of the corbel should not be more than the thickness of the wall

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Gravels

All listed here
Are cohesionless aggregates
Never swell when they come into contact with water
Vary in size between 2 to 20 mm

ANSWER DOWNLOAD EXAMIANS APP