Building Construction Pick up the commonly adopted geophysical method in civil engineering from the following: Both (A) and (B) of the above Electrical resistivity method Gravitational method The seismic method Both (A) and (B) of the above Electrical resistivity method Gravitational method The seismic method ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dutch bond is a modification of Header bond English bond Stretcher bond Single Flemish bond Header bond English bond Stretcher bond Single Flemish bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/10th of the span 1/6th of the span 1/8th of the span 1/12th of the span 1/10th of the span 1/6th of the span 1/8th of the span 1/12th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction While investigating the site, a thick layer of fairly firm clay over a deep layer of soft clay is encountered. In such a situation, the following type of foundation is useful: Grillage foundation Raft foundation Pile formation None of these Grillage foundation Raft foundation Pile formation None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wooden block fixed on back side of a door frame on its post, is known as Stop None of these Horn Cleat Stop None of these Horn Cleat ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of joint commonly used at the junction of a principal rafter and tie beam in timber trusses is Mortise and tenon joint Mitred joint Oblique mortise and tenon joint Butt joint Mortise and tenon joint Mitred joint Oblique mortise and tenon joint Butt joint ANSWER DOWNLOAD EXAMIANS APP