Building Construction Pick up the commonly adopted geophysical method in civil engineering from the following: Gravitational method The seismic method Electrical resistivity method Both (A) and (B) of the above Gravitational method The seismic method Electrical resistivity method Both (A) and (B) of the above ANSWER DOWNLOAD EXAMIANS APP
Building Construction To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as Closer Bat Stretcher Header Closer Bat Stretcher Header ANSWER DOWNLOAD EXAMIANS APP
Building Construction To construct a 10 cm thick partition wall, you will prefer Header bond Stretcher bond Flemish bond English bond Header bond Stretcher bond Flemish bond English bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of the ground water table may be ascertained by Looking through the well in the vicinity Measuring the depth of water in the well Standing on the well in the vicinity None of these Looking through the well in the vicinity Measuring the depth of water in the well Standing on the well in the vicinity None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundations are placed below ground level, to increase Strength All listed here Stability of structure Workability Strength All listed here Stability of structure Workability ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 12 18 24 25 12 18 24 25 ANSWER DOWNLOAD EXAMIANS APP