Building Construction The brick laid with its length parallel to the face of a wall, is a known as Header Closer Stretcher None of these Header Closer Stretcher None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The art of bringing the floor to a true level surface by means of screeds, is called Bedding Screeding Topping None of these Bedding Screeding Topping None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Auger boring Is the most primitive method for making a hole in the ground Is generally employed in cohesive and other self soils above water table Is most economical up-to a depth of 5 meters All of these Is the most primitive method for making a hole in the ground Is generally employed in cohesive and other self soils above water table Is most economical up-to a depth of 5 meters All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 10 % 25 % 20 % 15 % 10 % 25 % 20 % 15 % ANSWER DOWNLOAD EXAMIANS APP
Building Construction The columns of multi-storeyed buildings are designed to withstand the forces due to Wind loads Dead loads Live loads All of these Wind loads Dead loads Live loads All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wooden block fixed on back side of a door frame on its post, is known as None of these Stop Cleat Horn None of these Stop Cleat Horn ANSWER DOWNLOAD EXAMIANS APP