Building Construction
Auger boring

All of these
Is most economical up-to a depth of 5 meters
Is the most primitive method for making a hole in the ground
Is generally employed in cohesive and other self soils above water table

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In the method of tube boring of soil investigation, the following is essential:

A flap valve at the bottom of tube is provided to extract the soil sample
A tube of about 2 meters length and 20 cm diameter with a cutting edge
All listed here
The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand

ANSWER DOWNLOAD EXAMIANS APP