Building Construction In verandah (corridor) floors outward slope is 1 in 70 1 in 60 1 in 40 1 in 50 1 in 70 1 in 60 1 in 40 1 in 50 ANSWER DOWNLOAD EXAMIANS APP
Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 5 3 4 6 5 3 4 6 ANSWER DOWNLOAD EXAMIANS APP
Building Construction A roof which slopes in four directions, is called Gambrel roof Shed roof Gable end roof Hipped roof Gambrel roof Shed roof Gable end roof Hipped roof ANSWER DOWNLOAD EXAMIANS APP
Building Construction For the construction of flyovers in sandy soils, the type of foundation provided, is Strap footing Combined footing Pier footing Raft footing Strap footing Combined footing Pier footing Raft footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The radial splits which are wider on the outside of the log and narrower towards the pith are known as Starshakes Rindgalls Cupshakes Heart shakes Starshakes Rindgalls Cupshakes Heart shakes ANSWER DOWNLOAD EXAMIANS APP
Building Construction The art of bringing the floor to a true level surface by means of screeds, is called Bedding Topping Screeding None of these Bedding Topping Screeding None of these ANSWER DOWNLOAD EXAMIANS APP