Building Construction In verandah (corridor) floors outward slope is 1 in 40 1 in 50 1 in 60 1 in 70 1 in 40 1 in 50 1 in 60 1 in 70 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of multi-storeyed buildings, the forms to be removed first are Sides of beams and girders Bottom of beams and girders Column forms All the above at the same time Sides of beams and girders Bottom of beams and girders Column forms All the above at the same time ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple close roof is suitable for maximum span of 2.5 m 3.5 m 5.5 m 4.5 m 2.5 m 3.5 m 5.5 m 4.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the construction of arches, sand box method is used for Actual laying of arch work None of these Striking of centring Centring Actual laying of arch work None of these Striking of centring Centring ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 40 to 65 mm 25 mm 65 to 100 mm 25 to 40 mm 40 to 65 mm 25 mm 65 to 100 mm 25 to 40 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stone masonry of finely dressed stones laid in cement or lime, is Coursed rubble masonry Random rubble masonry Dry rubble masonry Ashlar masonry Coursed rubble masonry Random rubble masonry Dry rubble masonry Ashlar masonry ANSWER DOWNLOAD EXAMIANS APP