Building Construction In verandah (corridor) floors outward slope is 1 in 40 1 in 70 1 in 50 1 in 60 1 in 40 1 in 70 1 in 50 1 in 60 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of working a flat for the finishing coat, is known Dubbing out Floating Knitting Blistering Dubbing out Floating Knitting Blistering ANSWER DOWNLOAD EXAMIANS APP
Building Construction The 19 cm × 9 cm side of a brick as seen in the wall face, is generally known as Face Front Header Stretcher Face Front Header Stretcher ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundations are placed below ground level, to increase Stability of structure Strength All listed here Workability Stability of structure Strength All listed here Workability ANSWER DOWNLOAD EXAMIANS APP
Building Construction The disease of dry rot in timber is caused by Complete submergence in water None of these Alternate wet and dry conditions Lack of ventilation Complete submergence in water None of these Alternate wet and dry conditions Lack of ventilation ANSWER DOWNLOAD EXAMIANS APP
Building Construction For a rectangular foundation of width b, eccentricity of load should not exceed b/4 b/3 b/6 b/2 b/4 b/3 b/6 b/2 ANSWER DOWNLOAD EXAMIANS APP