Building Construction In verandah (corridor) floors outward slope is 1 in 70 1 in 60 1 in 50 1 in 40 1 in 70 1 in 60 1 in 50 1 in 40 ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 2, 1, 3, 5, 4 1, 2, 3, 4, 5 3, 2, 5, 1, 4 5, 4, 3, 2, 1 2, 1, 3, 5, 4 1, 2, 3, 4, 5 3, 2, 5, 1, 4 5, 4, 3, 2, 1 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of joint commonly used at the junction of a principal rafter and tie beam in timber trusses is Mitred joint Butt joint Oblique mortise and tenon joint Mortise and tenon joint Mitred joint Butt joint Oblique mortise and tenon joint Mortise and tenon joint ANSWER DOWNLOAD EXAMIANS APP
Building Construction The skirting/dado in a bath roof should be upto 15 cm above floor level 200 cm Ceiling Level of the tap 15 cm above floor level 200 cm Ceiling Level of the tap ANSWER DOWNLOAD EXAMIANS APP
Building Construction As compared to English bond, double Flemish bond is Stronger None of these Costly More compact Stronger None of these Costly More compact ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Extrados Spandril Intrados Rise Extrados Spandril Intrados Rise ANSWER DOWNLOAD EXAMIANS APP