Building Construction In verandah (corridor) floors outward slope is 1 in 60 1 in 40 1 in 70 1 in 50 1 in 60 1 in 40 1 in 70 1 in 50 ANSWER DOWNLOAD EXAMIANS APP
Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 4 6 3 5 4 6 3 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The members which support covering material of a sloping roof, are Rafters Struts Purlins Battens Rafters Struts Purlins Battens ANSWER DOWNLOAD EXAMIANS APP
Building Construction Minimum width of landing should be Half the width of stairs Equal to width of stairs Twice the width of stairs One fourth the width of stairs Half the width of stairs Equal to width of stairs Twice the width of stairs One fourth the width of stairs ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lintels are preferred to arches because Arches require more headroom to span the openings like doors, windows etc. All of these Arches require strong abutments to withstand arch thrust Arches are difficult in construction Arches require more headroom to span the openings like doors, windows etc. All of these Arches require strong abutments to withstand arch thrust Arches are difficult in construction ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Simplex pile Vibro pile Franki pile Pressure pile Simplex pile Vibro pile Franki pile Pressure pile ANSWER DOWNLOAD EXAMIANS APP