In verandah (corridor) floors outward slope is

1 in 40
1 in 70
1 in 50
1 in 60

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The bond in which headers and stretchers are laid in alternate courses and every stretcher course is started with a three fourth brick bat, is known as

Dutch bond
Monk bond
English cross bond
Rat-trap bond

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Couple close roof is suitable for maximum span of

3.5 m
5.5 m
2.5 m
4.5 m

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form work from the underside of slabs, can be removed only after

1 day
7 days
4 days
14 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The brick laid with its length parallel to the face of a wall, is a known as

Header
None of these
Closer
Stretcher

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The member which is placed horizontally to support common rafter of a sloping roof, is

Cleat
Purlin
Strut
Batten

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑