Building Construction In verandah (corridor) floors outward slope is 1 in 50 1 in 40 1 in 70 1 in 60 1 in 50 1 in 40 1 in 70 1 in 60 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 15 to 20 cm 5 to 10 cm 25 to 30 cm 30 to 45 cm 15 to 20 cm 5 to 10 cm 25 to 30 cm 30 to 45 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling Is not economical for holes of less than 10 cm All listed here Is not suitable for deposits containing very coarse gravel Hinders the ground water observations and permeability test Is not economical for holes of less than 10 cm All listed here Is not suitable for deposits containing very coarse gravel Hinders the ground water observations and permeability test ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of footing which is used to transmit heavy loads through steel columns is Isolated footing Well foundation Grillage foundation Raft foundation Isolated footing Well foundation Grillage foundation Raft foundation ANSWER DOWNLOAD EXAMIANS APP
Building Construction You are asked to design and supervise a truss for a factory to have spans 6 m to 9 m. The type of the truss you will use, is King post truss Collar truss Mansard truss Queen post truss King post truss Collar truss Mansard truss Queen post truss ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 2, 1, 3, 5, 4 5, 4, 3, 2, 1 1, 2, 3, 4, 5 3, 2, 5, 1, 4 2, 1, 3, 5, 4 5, 4, 3, 2, 1 1, 2, 3, 4, 5 3, 2, 5, 1, 4 ANSWER DOWNLOAD EXAMIANS APP