Building Construction The under surface of an arch, is called Haunch Soffit Back Intrados Haunch Soffit Back Intrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum number of steps in a flight should generally be restricted to 12 10 15 No limit 12 10 15 No limit ANSWER DOWNLOAD EXAMIANS APP
Building Construction Best type of piles for soft soil having little resistance to the flow of concrete, is Vibro pile Raymond pile Franki pile Simplex pile Vibro pile Raymond pile Franki pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The highest line of sloping roof, where two opposite slopes meet, is known as Eave Crown Ridge Rafter Eave Crown Ridge Rafter ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 5, 4, 3, 2, 1 3, 2, 5, 1, 4 1, 2, 3, 4, 5 2, 1, 3, 5, 4 5, 4, 3, 2, 1 3, 2, 5, 1, 4 1, 2, 3, 4, 5 2, 1, 3, 5, 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The wedge shaped bricks forming an arch ring, are called Spandrils Soffits Voussoirs Haunches Spandrils Soffits Voussoirs Haunches ANSWER DOWNLOAD EXAMIANS APP