Building Construction A floor constructed with 3 mm marble chips, is known Mosaic floor Chips floor Marble floor Terrazzo floor Mosaic floor Chips floor Marble floor Terrazzo floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple close roof is suitable for maximum span of 4.5 m 3.5 m 5.5 m 2.5 m 4.5 m 3.5 m 5.5 m 2.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger borings are not common In cohesive soils In soils that require lateral support In soft soils None of these In cohesive soils In soils that require lateral support In soft soils None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to 40 mm 30 mm 20 mm 10 mm 40 mm 30 mm 20 mm 10 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile provided with one or more bulles in its vertical shaft, is generally known as Sheet pile Under-ream pile Friction pile Bearing pile Sheet pile Under-ream pile Friction pile Bearing pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Peeling Dubbing Hacking Blistering Peeling Dubbing Hacking Blistering ANSWER DOWNLOAD EXAMIANS APP